![HANGCHA GTHZ120 Operation Manual Download Page 14](http://html1.mh-extra.com/html/hangcha/gthz120/gthz120_operation-manual_3579375014.webp)
11
Do not use a brand new aerial work platform until you have done the following inspections.
The added lubricant should suit the local weather conditions, -15° to 40°. Before the first use,
add the appropriate lubricant according to the ambient temperature.
Before Using the Aerial Work Platform for the
First Time
Instructions
-Our aerial work platform can provide you with convenient operation and easy maintenance.
-Before using the aerial work platform for the first time, the user must read each section of this manual carefully. It
can help you solve all operation and maintenance problems. Using these instructions will help you to operate the
aerial work platform better.
-The user must understand roles and locations of different function prompts on the controller before operating the
aerial work platform.
Lubricant
-Check whether the lubricant is added as specified (refer to Periodic Maintenance).
Hydraulic system
-Visually inspect gaskets, hoses, square tubes and joints for oil leaks. Where necessary, tighten or check joints for
problems.
-Check the oil level of the tank.
Tires
-Make sure all tire nuts are set in place (refer to Part C Every 50 working hours).
Electrical system
-Check the capacity and specific gravity of the electrolyte in the battery.
-Check the components of the electrical system, such as wiring harnesses and retaining clips.
Contact your dealer where necessary.
Summary of Contents for GTHZ120
Page 2: ...2 ...
Page 5: ...2 Ⅰ Overview ...
Page 15: ...12 II Description ...
Page 16: ...13 ...
Page 17: ...14 Dimensions GTHZ120 ...
Page 18: ...15 GTHZ120 ...
Page 19: ...16 GTHZ17 0 ...
Page 20: ...17 GTHZ170 ...
Page 21: ...18 GTHZ170 C ...
Page 22: ...19 GTHZ170C ...
Page 43: ...40 GTHZ120 The corresponding functions of the electromagnetic valves are as follows ...
Page 47: ...44 GTHZ120 GTHZ170 170C ...
Page 48: ...45 ...