
Operation
20
Automatic eyeletting machine 102-50
Hang OM
Image 6.5.3
Pressure setting
Slacken the screw [4] on the lower punch.
Turn the adjusting screw [5] relative to the length of the eyelet
To the right - lower punch moves upwards - riveting pressure increases.
To the left - lower punch moves downwards - riveting pressure decreases.
Re-tighten the screw [4] on the frame [3].
Close the protective hood and test the eye punch (follow the instructions in
the
“
Operation
”
chapter).
Reattach the worktop.