1. Continue to add bales until there are 3 bales remaining.
2. Flip the Mode Switch to the Manual Mode to manually wrap the last 3 bales. As the last bales are going
through, apply more film to the seams between each of the bales.
3. Install an end cap on the last bale and continue to wrap the last bale manually until the pusher is to the
end.
4. Return the pusher to its home position.
5. Shut engine off.
WRAPPER PULL-OUT
1. Open the wheel brake lockout valve.
2. Extend the tongue out to the transport position making sure that the tongue is securely locked.
3. Hook the tongue to a tow vehicle and slowly pull the machine away from the bales.
4. Start the engine, raise the tail/ramp into the transport position, close the tail/ramp lockout valve and
connect the tail/ramp lock bar for transport.
5. Shut the engine off. The machine is now ready for transport.
6. Inspect the row for any holes that may have been made. If holes are present, seal with duct tape.
OPERATION
BALE PUSH-OFF
1. Remove the 2 pins and clips for the last bale
push off, fold out mechanism to the locked
position, and replace the pins and clips.
2. Start engine and push the Start/Reset
switch on control panel.
4. Again manually start wrapping the last bale.
When the last bale has been fully wrapped,
release the manual hoop switch.
5. Shut engine off.
6. Cut off plastic film between bale and pre-stretcher.
7. Re-start engine, push the Start/Reset switch on control panel and hold the manual pusher forward
switch until the last bale is pushed as far as possible.
8. Return the pusher to its home position.
9. Shut engine off.
10. Remove the 2 pins and clips for the last bale push off, retract the mechanism to the storage position
and replace the pins and clips.
Summary of Contents for BW1000 LINEWRAP BW1000 LINEWRAP
Page 3: ......
Page 4: ......
Page 6: ...Intentionally Left Blank 4...
Page 8: ...6 Intentionally Left Blank...
Page 11: ...SAFETY INFORMATION 9...
Page 12: ...SAFETY INFORMATION 10...
Page 15: ...13...