background image

GB

85

TILE

Middle side stone

TILE

Lower front 
stone

H26T Low/H26K Low

Check that the 
type plates are in 
place. 

Hang the middle side 
stones into place using 
the keyholes in the side 
profiles. Then tighten the 
screw that is holding the 
front side profile in the 
insert.

Hook the front side profile onto the 
lower side stone’s suspension plate and 
secure its upper edge with screws in 
both the insert and side profile. Do not 
tighten the screw in the insert until the 
second layer of side stones are in place. 

Install the two, lower front profiles on the lower 
front stone so that they are edge to edge with the 
short sides of the stone. Insert the front stone 
between the lower side stones so that they are 
locked into place by the front stone’s profiles.

Summary of Contents for H26T/K Tall

Page 1: ...INSTRUCTIONS 26T 26K Installation...

Page 2: ...n approved by a qualified inspector Your local chimney sweep must also be informed about the installation as this will affect the routines for regular chimney sweeping services 378 001 N ORDIC ECOLAB...

Page 3: ...to welcome you to the Hand l family We hope your new stove will give you a great deal of pleasure Your choice of a Hand l stove is testimony to the high standards you demand in terms of quality and de...

Page 4: ...ect the floor from any embers If the floor under the stove is combustible it must be protected with a minimum of 12 mm of non combustible material that covers at least 300 mm of the floor in front of...

Page 5: ...o upward chimney connection B height from floor to c c rear chimney connection C distance from back to c c upward chimney connection D distance from back to rear chimney connection E distance from bac...

Page 6: ...base plate 288 100 600 890 500 400 300 200 300 400 500 200 Combustible wall Permitted area for combustible material 435 120 8 9 0 810 Combustible wall Fire retardant wall of brick or concrete 365 50 7...

Page 7: ...ustion is approximately 25 m3 hr The illustrations to the right show various installation alternatives The external diameter of the air duct connection on the stove is 64 mm In heated areas the duct m...

Page 8: ...ible hose must be used See illustrations on pages 77 and 78 190 940 780 125 Eldstadsplan 3 2 0 Hearth plate for the Hand l 20 series optional BAV SE EX 0601 2 511299 Eldningsinstruktion och bruksanvis...

Page 9: ...ng from the top the hot air grate must be installed before the chimney Chimney mantle Stop washer Start pipe Rear connection to a masonry chimney Mark out the centre for making a hole in the wall to t...

Page 10: ...t the distance from the guide plate up to the rear edge of the door is 445 mm Check that the insert is vertically straight Position the guide plate according to the installation dimensions and ensure...

Page 11: ...one at this stage Use the upper outlet on a tall model only if installing a baking oven Otherwise use the lower outlet Assemble the rear side profiles with two screws M6x20 each Check that the profile...

Page 12: ...rows are even and straight so that the tiles do not become misaligned or the gaps between them too large While you are installing the stove make sure that all the stones tiles are level and that each...

Page 13: ...front side profile onto the lower side stone s suspension plate and secure its upper edge with screws in both the insert and side profile Do not tighten the screw in the insert until the second layer...

Page 14: ...side profile Check that it is at the same height as the side stones and then tighten the screws Screw the upper front profiles securely into place in the side stones Press the profile upwards so that...

Page 15: ...amper can be opened and closed properly Position the top stones on top of the stove Pins are placed in the soapstone top for the grate to rest on Position the adjusting screws on the top of the back p...

Page 16: ...straight Push in the lower side stones from the front so that their suspension plates hook into the horizontal keyholes of the side profiles Make sure that there is a 5 mm gap between the stone and t...

Page 17: ...th the insert and side profile Do not tighten the screw in the insert until the second layer of side stones are in place Install the two lower front profiles on the lower front stone so that they are...

Page 18: ...mm between the screw flange and the stone Then insert them into the smaller keyholes in the side profiles and check that they are level before finally tightening the screws Hang the middle side stone...

Page 19: ...es securely into place in the side stones Press the profile upwards so that its bent edge is against the lower edge of the side stone Slide the end of the flexible aluminium hoses down into the convec...

Page 20: ...o the upper front stone leaving 4 5 mm between the screw flange and the soapstone Hang the stone into place in the keyholes and allow it to rest against the bent edge of the side profile Check that it...

Page 21: ...n the pins or the cast edge of the tile top Check that the damper can be opened and closed properly Position adjusting screws on the top of the back plate and screw them down so that the screw heads a...

Page 22: ...nd secure it onto the back or top of the oven depending on whether the chimney is to be connected from the rear or directly upwards Hang the stone into place in the keyholes and allow it to rest again...

Page 23: ...ng onto the surface Adjusting screw Position the screen so that it is resting on the corner profiles Slacken the uppermost screws on the corner profiles and fasten the screen into these Screw the conv...

Page 24: ...IAV SE EX 1019 3 811008 Place the base plate of the heat tank on the top of the insert Then place the tank stones as illustrated and push the aluminium hoses through the holes in the tank stone and do...

Page 25: ...den www handol se NIBE Stoves reserves the right to change colours materials dimensions and models at any time without special notice Your dealer can provide you with the latest information The stoves...

Reviews: