![Hamworthy Stratton mk3 Manual Download Page 22](http://html1.mh-extra.com/html/hamworthy/stratton-mk3/stratton-mk3_manual_3494096022.webp)
22
80-150 kW Frame & Header Kits Manual
8 COMMISSIONING AND TESTING
1. Electrical and gas safety checks must be carried out on completion of installation as with individual boiler commissioning.
2. Pump setting - follow the instructions supplied with the pump, referring to the installation manual
REV.BY
ECN No.
DATE
ALL DIMENSIONS IN MM
DO NOT SCALE, IF IN DOUBT - ASK.
DRAWING VOID IF AMENDED MANUALLY
MATERIAL
DRAWN BY
CHECKED BY
ECN No.
FINISH
DATE
SCALE
NTS
FIRST
ANGLE
PROJECTION
THIS DOCUMENT IS COPYRIGHT PROTECTED BY IDEAL BOILERS.
IT MUST NOT BE COPIED, REPRODUCED OR COMMUNICATED
TO ANY THIRD PARTY WITHOUT CONSENT OF IDEAL BOILERS.
THIS DRAWING REFERENCES A 3D FILE OF THE SAME
NAME AND UIN. ADDITIONAL DETAIL CAN BE GAINED
FROM THIS 3D FILE
2
2
3
3
4
4
UPMXXL
Magna 1