HAMWORTHY HEATING LTD
56
FLEET V series
500001213/G
APPENDIX F - CASCADE CONTROL
To Convert the boiler hydraulic diagram for cascade control
Before programming changes are made, ensure the boiler is set to standby mode.
Press and hold both up and down arrow keys for at least five seconds to enter advanced parameter list H90
displayed top right of HMI screen.
Use either up or down arrow key to scroll through the parameter list and stop at H552
Option 1 - for use with the Merley sequence controller
To enable cascade control change the setting by using the + or – key and set value to 80.
Press mode button to store change and return to home screen.
Figure. F1
Summary of Contents for F40V
Page 2: ......
Page 40: ...HAMWORTHY HEATING LTD 34 FLEET V series 500001213 G Figure 8 3 11 Operating phases...
Page 63: ...HAMWORTHY HEATING LTD 57 FLEET V series 500001213 G NOTES...
Page 66: ......
Page 67: ......