HAMPTON BAY H35-NG2 Owners & Installation Manual Download Page 24

Hampton

®

 H35-2 Direct Vent Freestanding Gas Stove

23

Diagram 7

Diagram 6

Diagram 5

Diagram 4

 b)

  The location of the horizontal vent termi-

nation on an exterior wall must meet all 
local and national building codes, and 
must not be blocked or obstructed. See 
diagram in the "External Vent Terminal 
Locations" section.

4)

  If installing the vent termination to a wall with 

vinyl siding, the Vinyl Siding Standoff must 
be used. Attach the Vinyl Siding Standoff 
to the Horizontal Vent Termination, but fi rst 
run a bead of non-hardening mastic around 
its outside edges, so as to make a seal 
between vent cap and the standoff. Install 
the Vinyl Siding Standoff) between the vent 
cap and the exterior wall and attach with the 
four wood screws provided. Seal around 
the Vinyl Siding Standoff on all four sides. 
Diagram 6.   

The arrow on the vent cap 

should be pointing up.

 Insure that the 

1-1/4" clearances to combustible materials 
are maintained. See diagram 4.

Note:  If installing termination on a siding 

covered wall, a vinyl siding standoff or 
furring strips must be used to ensure 
that the termination is not recessed 
into the siding. The four wood screws 
provided should be replaced with ap-
propriate fasteners for stucco, brick, 
concrete, or other types of sidings.

5)

  Before connecting the horizontal run of vent 

pipe to the vent termination, slide the black 
decorative wall thimble cover over the vent 
pipe, then slide the Wall Thimble over the 
vent pipe.

6)

  Slide the appliance and vent assembly 

towards the wall carefully inserting the 
vent pipe into the vent cap assembly. It is 
important that the vent pipe extends into 
the vent cap a suffi cient distance so as to 
result in a minimum pipe overlap of 1-1/4 
inches. Secure the connection between the 
vent pipe and the vent cap by attaching the 
two sheet metal strips extending from the 
vent cap assembly into the outer wall of the 
vent pipe. Use the two sheet metal screws 
provided to connect the strips to the pipe. 
Bend any remaining portion of the sheet 
metal strip back towards the vent  cap, so 
it will be concealed by the decorative wall 
thimble cover. See Diagram 5.

VERTICAL 

TERMINATION

RIGID VENT SYSTEM

1)

  Maintain the 1-1/4" clearances (air spaces) 

to combustibles when passing through ceil-
ings, walls, roofs, enclosures, attic rafter, or 
other nearby combustible surfaces. Do not 
pack air spaces with insulation. Check the 
"Exterior Vent Terminal Locations" section 
for the maximum vertical rise of the venting 
system and the maximum horizontal offset 
limitations.

2)

  Set the gas appliance in its desired loca-

tion. Drop a plumb bob down from the 
ceiling to the position of the appliance fl ue 
exit, and mark the location where the vent 
will penetrate the ceiling. Drill a small hole 
at his point. Next, drop a plumb bob from 
the roof to the hole previously drilled in 
the ceiling, and mark the spot where the 
vent will penetrate the roof. Determine if 
ceiling joists, roof rafters or other framing 
will obstruct the venting system. You may 
wish to relocate the appliance or to offset, 
as shown in Diagram 8 to avoid cutting load 
bearing members.

 

Note:

 a)

  The horizontal run of vent should have 

a 1/4 inch rise for every 1 foot of run 
towards the termination. Never allow the 
vent to run downward. This could cause 
high temperatures and may present the 
possibility of a fi re.

INSTALLATION

7)

  Install wall thimble in the center of the 10" 

square and attach with wood screws.

8)

  Slide the decorative wall thimble up to the 

wall surface being careful not to scratch the 
paint and attach with screws provided. Apply 
decorative brass or chrome trim if desired. 
See Diagram 6.

Summary of Contents for H35-NG2

Page 1: ...supplier FOR YOUR SAFETY What to do if you smell gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from...

Page 2: ...VER WILL CAUSE BURNS GLASS UNTIL COOLED ALLOW CHILDREN TO TOUCH GLASS CHILDREN AND ADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURES ESPECIALLY THE FIREPLACE GLASS AND SHOULD STAYAW...

Page 3: ...n designed to provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model H35 2 has been approved by Warnock Hersey for both safety and efficiency As it also bears...

Page 4: ...allation Checklist 7 Clearances to Combustibles 7 Locating Your Gas Stove 8 Manufactured Mobile Home Requirements 8 Combustion and Ventilation Air 8 Optional Fan Installation 8 Venting Introduction 9...

Page 5: ...e is only for use with the type of gas indicated on the rating plate and may be installed in an aftermarket permanently located manufactured mobile home where not prohibited by local codes See owner s...

Page 6: ...directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT...

Page 7: ...r use with other gases unless a certified kit is used INSTALLATION AND REPAIRS SHOULD BE DONE BY A QUALIFIED SERVICE PERSON THIS APPLIANCE SHOULD BE INSTALLED REPAIRED INSPECTED BE FORE USE AND AT LEA...

Page 8: ...c DV Stove Horizontal Vent Kit d Dura Vent Termination Kit 5 Make gas connections Refer to the Gas Connection section Test the pilot Must be as per diagram in the Maintenance Instruction section If co...

Page 9: ...e cut or remove the 3 aluminum air intake pipes Hint for pushing fan down onto pins rub a bit of dish soap on the pins so the grommets will slide down more easily Check to make sure the fan is seated...

Page 10: ...Kit and the rigid pipe venting systems in combination with the DirectVentFreestandingGasStoves H35 NG2 and H35 LP2 have been tested and listed as direct vent heater systems by Warnock Hersey These uni...

Page 11: ...f center line extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air in...

Page 12: ...A N A N A Adjustable Length 3 10 Galvanized N A N A N A 4DAL N A TC 4DLT Adjustable Length 3 10 Black N A N A N A 4DALB N A TC 4DLTB Adjustable Length 7 Galvanized N A N A 4D7A N A N A N A Adjustable...

Page 13: ...TM 4ST14 Snorkel Termination 36 46DVA HC N A N A N A N A TM 4ST36 Basic Horizontal Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK N A Horizontal Termination Kit B 46DVA KHA Changed Components 4DT...

Page 14: ...AstroCapTM is a proprietary trademark of FPI Fireplace Products International Ltd Dura Vent and Direct Vent Pro are registered and or proprietary trademarks of Simpson Dura Vent Co Inc This product h...

Page 15: ...ecombinationsofverticalrunswith horizontal terminations Maximum one 90O elbow two 45o elbows equal one 90o elbow All approved caps listed on page 12 may be used Propane and Natural Gas Residential Man...

Page 16: ...osition A Refer to the Conversion Kit to Lower BTU Rating section for de rating instructions Note If venting this appliance as per the diagrams shown in the two diagrams the unit must be derated using...

Page 17: ...et total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required With these options maxi mum total pipe length is 30 feet with minimum of 8 feet total vertical a...

Page 18: ...etween 90o elbows is required Option H H1 V A 2 Max 2 Min B 3 Max 3 Min C 4 Max 4 Min D 5 Max 5 Min E 6 Max 6 Min Withtheseoptions max total pipelengthis30feetwithmin of6feettotalverticalandmax 6 feet...

Page 19: ...flex running the full length of the chimney See the Venting Arrangements chart below for minimum and maximum flue lengths See chart below for minimumdistancesfromroof Periodicallycheck that the vent...

Page 20: ...the 45o elbow willseatontoboththestartercollarand the 90o elbow Crimped section of rigid pipe seats into the 90o elbow Onlycuttheuncrimpedsideofpipe Dismantle all pipe sections including vent terminal...

Page 21: ...enter ing and to make a tight seal between the cap and the standoff 7 Stretch the 4 dia flex liner out fully and get a trial fit of the liner onto the 4 dia starter collar 8 Cut the 4 dia flex liner...

Page 22: ...of the unit to the wall It is also important to note the wall thickness The wall thimble is suitable for 2 x 4 or 2 x 6 wall construc tion Selecttheamountofverticalrisedesiredfor vertical to horizont...

Page 23: ...pliance adaptor is installedontheunitatthefactory Assemble the desired combination of pipe and elbows to the appliance adaptor with pipe seams orientedtowardsthewallorceiling asmuch out of view as pos...

Page 24: ...re the connection between the vent pipe and the vent cap by attaching the two sheet metal strips extending from the vent cap assembly into the outer wall of the vent pipe Use the two sheet metal screw...

Page 25: ...or performance issues not covered under warranty Silicone red RTV is optional INSTALLATION 4 Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adaptor up tho...

Page 26: ...out doors and caps or plugs for cleanout tee fittings and ash dumps shall be secured in place and sealed before installing a Direct Vent system within the chimney If the appliance shuts off during ope...

Page 27: ...Orifice Size 33 DMS Convertible to Max Input Rating 30 000 Btu h Min Input Rating 14 300 Btu h Orifice Size 37 DMS Propane Max Input Rating 34 000 Btu h Min Input Rating 17 500 Btu h Orifice Size 51 D...

Page 28: ...ote Any damage due to carboning re sulting from improperly setting the aeration controls is NOT covered under warranty Note Aeration Adjustment should only be performed by an authorized Hamp ton Insta...

Page 29: ...ilot cap to expose the pilot orifice Remove the 2 screws push Burner Assembly to the left and lift out Burner Orifice Installation of LPG Conversion Kit 1 Shut off the gas supply 2 H35 2 Lift off the...

Page 30: ...d with the red o ring visible Fig 5 16 Reassemble the black protection cap Fig 6 WARNING Also check that the pilot and main burner injectors are appropriate for the gas type LPG Configuration Red o ri...

Page 31: ...e or place this in a convenient location away from the heat source 14 Tie up the loose wire with the wire clip Installation of the DC Sparker for the P90 Units Only 1 Locate the Piezo Ignitor situated...

Page 32: ...wire from kit 9 Plug the DC spark generator wires to the DC Sparker 10 Connect the ground wire to the DC Sparker mounting bracket 12 Mount the heat shield to the DC Sparker Secure into place with the...

Page 33: ...tu 1 918 148 Instruction Sheet 1 Shut off the gas supply 2 Open the front door Carefully remove the logs and lava rock Refer to manual for more detailed instructions 3 Remove burner by removing 2 scre...

Page 34: ...n the screws Vent Restrictor setting at Low Btu for Straight Horizontal Venting 13 Attach the label This unit has been con verted to on top of the Serial decal over the higher Btu information 14 Check...

Page 35: ...ure proper light off make sure flame flows smoothly from one end of burner to the other If there is any flame hesitation check that area for any blockage of the burner port F 0 2 4 7 E 02 45 A 02 43 G...

Page 36: ...lf and cast top can be adjusted by sliding it in or out Once in final position tighten 2 screws shown in step 2b as shown below 8 Repeat on other side 1 Lift off the Cast Top 3 Flip assembled shelf ov...

Page 37: ...power failure theburnerswitchandtheoptionalremotecontrol thermostat will continue to operate However a 120V A C power supply is needed for the fan blower operation Caution Ensure that the wires do no...

Page 38: ...maximum wire length Note Preferableifthethermostatisinstalled on an interior wall Hampton offers an optional programmable thermostat but any 250 750 millivolt rated non anticipator type thermostat tha...

Page 39: ...unit the logs have been incorrectly positioned 7 The unit should never be turned off and on again without a minimum of a 60 second wait 1 Choose a convenient location on the wall to install the recei...

Page 40: ...air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any phone in your building Immediately call your gas supplie...

Page 41: ...Body Firebox Different types and thicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sounds will be heard throughout the cycling process WARNING CH...

Page 42: ...The unit should never be used with broken logs Turn off the gas valve and allow the unit to cool before opening door to carefully remove the logs The pilot light generates enough heat to burn someone...

Page 43: ...11 mm wrench 16 Remove valve to orifice nut with a 13 16 wrench 17 Remove inlet pipe with pipe wrench Note orientation of 90o elbow 18 Remove two 2 phillips head M5 screws on each side of the valve 1...

Page 44: ...xchanger Assy 47 Transition Box Assy Top Relief Door Assembly 50 W260260 Top Relief Frame Gasket 51 942 117 Top Relief Frame 52 W260280 Top Relief Plate Gasket 53 290 021 Top Relief Plate 54 Capscrew...

Page 45: ...470 Pilot Assembly Gasket 69 Valve Shield 70 Valve Bracket 71 Valve Gasket 72 Front Support 73 730 528 Rear Log Bracket Assy 75 402 935 Log Set 740 572 Ember Package 78 730 550 Burner Assy 740 546 Bas...

Page 46: ...Hampton H35 2 Direct Vent Freestanding Gas Stove 45 NOTES...

Page 47: ...46 Hampton H35 2 Direct Vent Freestanding Gas Stove NOTES...

Page 48: ...requested It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced component has been returned to FPI and evaluated for manufacturer d...

Page 49: ...__________________________________________ Printed in Canada Hampton is a trademark of FPI Fireplace Products International Ltd Hampton fireplace products are designed with reliability and simplicity...

Reviews: