![HAMPTON BAY H35-NG2 Owners & Installation Manual Download Page 22](http://html1.mh-extra.com/html/hampton-bay/h35-ng2/h35-ng2_owners-and-installation-manual_3550330022.webp)
Hampton
®
H35-2 Direct Vent Freestanding Gas Stove
21
Pipe Length
Round Support
Box/Wall Thimble
Vertical
Terminal
Storm Collar
Flashing
Ceiling
Firestop
*24" Pipe Length
Dura-Vent Horizontal
Termination Installation
Dura-Vent Vertical
Termination Installation
*Adj.Pipe Length
*90 Elbow
o
*Round Support
Box/Wall Thimble
*Horizontal
Termination Cap
Wall Thimble
(B)
Vinyl Siding
Standoff
(Optional)
Cathedral
Ceiling
Support Box
(D)
Vertical Termination Kit
(A)
*Horizontal Termination Kit
Dura-Vent Basic
Horizontal Kit
# 46DVA-KHB
1 90
o
Elbow
1 Wall
Thimble
Cover
1 Horiz. Sq. Term. Cap
INSTALLATION
DURA-VENT TERMINATION KIT
Planning Your Dura-Vent
Installation
There are two basic types of Dura-Vent Direct
Vent System installations: horizontal termination
and vertical termination. Confi rm the maximum
horizontal run and maximum vertical rise from the
diagrams in the "Venting Arrangement" section.
When planning your installation, it will be nec-
essary to select the proper length of vent pipe
for your particular requirements. For horizontal
installations, determine the minimum clearance
from the rear of the unit to the wall. It is also
important to note the wall thickness. (The wall
thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired for
"vertical-to-horizontal" type installations.
Warning: Always maintain required
clearances (air spaces) to nearby
combustibles to prevent a fire
hazard. Do not fi ll air spaces with
insulation.
The minimum clearance requirements between
the outer wall of the vent pipe and nearby com-
bustible surfaces is 1-1/4 inch. Be sure to check
the vent termination clearance requirements
from decks, windows, soffi ts, gas regulators,
air supply inlets and public walkways as speci-
fi ed in the "Exterior Vent Terminal Locations"
section and in your local building codes.
To determine the length of vent pipe required
for vertical installations, measure the distance
from the unit fl ue outlet to the ceiling, the ceiling
thickness, the vertical rise in an attic or second
storey, and allow for suffi cient vertical height
above the roof line.
For multi-storey applications, fi re stops are
required at each fl oor level. If an offset is
needed, additional pipe, elbows and supports
will be required.
Do not exceed the maximum number of elbows.
One 90
o
for horizontal terminations and two
45
o
for vertical termination.
Alternate
Horizontal
Termination Caps