
P29 Instruction Manual
2
Revision overview
Version: Date:
Author:
Amendments:
A
Re
Initial Revision
B
09/2014
Me
Screw terminal for output signal as 4-pole
C
07/2016
Me
New display/ user keys
External zero-point calibration as option
D
10/2017
Me
Assembly information (heat/vibrations)
Dimension drawings
certificate of conformity
E
12/2018
MM
Chapter 2.1 Safety concept
Chapter 3.1 Start-up
New LCD(with colours);
F
12/2018
Ka
Change “flammable gases” to “natural gas”
Chapter 2 Safety precautions
Chapter 3 Start up
G
11/2020
Me
Output signal range
Chapter 4.5 added
Update technical data
Dimension drawing
H
06/2022
Me
UKCA
Chapter structure
Chapter 7.3.6 added (Filter)
I
01/2023
Me
Update technical data, Revision Overview; QR-Code
2.2 Notice of Responsibility.
New 2.3 Changes to the device - loss of explosion protection,
New 2.5 Services; 3.1 flush revised,
New 3.3 leak test. 3.3 shipping now 3.4
chapter 10: problem added. All illustrations labelled
New 10.1 Check fuse; New 10.2 Replace fuse
9. Specifications: overload ca checks updated
© 2023, Ts
The manufacturer owns the copyright to this instruction manual. It contains technical data, instructions
and drawings detailing the device’s features and how to use them. It must not be copied either wholly
or in part or made available to third parties.
The instruction manual is part of the product. Please read this manual carefully, follow our
instructions, and pay special attention to the safety information provided. This instruction manual
should be available at all times. Please contact the manufacturer if you do not understand any part of
the instructions.
The manufacturer reserves the right to continue developing this device model without documenting
such development in each individual case. The manufacturer will be happy to determine whether this
manual is up-to-date.