background image

3

20000225117B

Instructions for Use

Introduction

Please read these instructions and follow them carefully for the
safe and economical use of your boiler.

The Halstead Buckingham 4 CFF series are fanned flue boilers
with chimney adapter. They provide heating and if required, an
indirect domestic hot water supply.

The boiler is automatic in operation, having only one user
control, the boiler temperature control.

Gas Safety (Installation and Use) Regulations

In your own interests and that of safety, it is the law that ALL gas
appliances are installed by a competent person in accordance
with the current issue of the above regulations.

WARNINGS

Gas Leak or Fault

If a gas leak fault exists or is suspected the boiler must be
turned off, including the electrical supply and must not be
used until the fault has been put right.  Advice/help should
be obtained from the local gas undertaking or your installation/
servicing company.

Clearances

Make sure that nothing obstructs the ventilation grills or
clearances.

Minimum clearances must be left around the boiler as
shown in diagrams 1.5, 1.6 & 1.7.

Sheet Metal Parts

This boiler contains metal parts (components) and care
should be taken when handling and cleaning, with particular
regard to edges.

Sealed Components

DO NOT interfere with any sealed components within this
appliance.

Cleaning

Keep the casing clean by wiping it occasionally with a damp
soapy cloth and dry with a polishing cloth.

Do not use abrasive cleaners.

Boilers Installed in a Compartment

If the boiler is fitted in a compartment, cupboard etc., do not
obstruct the purpose built compartment vents or the grill on the
boiler.

Do not use the compartment for storage purposes.

Protection Against Freezing

If the boiler is to be out of use for any period of time during severe
weather conditions we recommend the whole system including
the boiler, be drained off to avoid the risk of freezing up.  If an
immersion heater is fitted to the hot water cylinder make sure it
is switched off.

Maintenance

To ensure the continued efficient and safe operation of the boiler
it is recommended that it is checked and serviced as necessary
at regular intervals.  The frequency of servicing will depend upon
the particular installation conditions and usage, but in general
once a year should be enough.

It is the law that servicing must be carried out by a competent
person.

If this appliance is installed in a rented property in the UK there
is a duty of care imposed on the owner of the property by the
current issue of the Gas Safety (Installation and Use) Regulations,
Section 35.

To obtain service please call your installer or Halstead Boilers
using the telephone number given on the inside of the front
panel.

Please be advised that the ‘Benchmark’ logbook should be
completed by the installation engineer on completion of
commissioning and servicing.

All CORGI Registered Installers carry a CORGI ID card, and
have a registration number.  Both should be recorded in your
boiler Logbook.  You can check your installer is CORGI registered
by calling CORGI direct on :- 01256 372300.

Boiler Electrical Supply

THIS BOILER MUST BE EARTHED.

The boiler must only be connected to a 230V~50Hz supply
protected by a 3A fuse, maximum.

All wiring must be in accordance with the current issue of
BS7671.

Heat resistant flexible cable having a conductor size of 0.75mm

2

,

to the current issue of BS6500 Table 16 must be used.

To Connect an Electrical Plug

The standard colours of three core flexible cable are,

Brown - live, Blue - neutral, Green and Yellow - earth.

As the markings on your plug may not correspond with these
colours, continue as follows:

The Blue cable must be connected to the terminal marked “N”
or “Black”.

The Brown cable must be connected to the terminal marked “L”
or “Red”.

The Green and yellow cable must be connected to the terminal

marked “E” or “Green” or the earth symbol 

.

Summary of Contents for Buckingham 4

Page 1: ...of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f t w i t h t h e u s...

Page 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Page 3: ...the whole system including the boiler be drained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensuretheco...

Page 4: ...te control Note If the boiler is turned OFF at the boiler temperature control wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic light...

Page 5: ...ety Installation and Use Regulations The appropriate Buildings Regulations either The Building Regulations The BuildingRegulations Scotland The Building Regulations Northern Ireland The Water Fittings...

Page 6: ...TIONS MIN MAX To floor level FLOOR LEVEL 9922 1 General Data Diagram 1 5 MINIMUM CLEARANCES LEVEL WITH WORKTOP 9923 494 MIN 494 MIN CUPBOARDS WORKTOP 10 10 BOILER BOILER 5 MAX 900 MIN 860 Diagram 1 3...

Page 7: ...l obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartment modified fo...

Page 8: ...essarily high when the central heating pump is off The domestic primary flow and return must be 28mm o d The installation must comply with the current issue of BS5546 and BS6700 see diagram 2 1 If the...

Page 9: ...must be adequately sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge height but at the least above the eaves of...

Page 10: ...ir vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both the high and low level openings must communicate with the same room or m...

Page 11: ...emaining lower connections may be used for the gravity domestic hot water return Fit plugs into any unused boiler tappings 4 3 Water Connections Fully Pumped Systems Fit suitable fittings into the boi...

Page 12: ...gas pipework must be along the left hand side of the boiler 4 Installation No 8 SCREW 4 Diagram 4 4 PIPEWORK CASING CLEARANCES 9860 Diagram 4 6 PLASTIC PEG PLASTIC PEG SPRING CLIP SIDE CASING R H SHOW...

Page 13: ...e factory with the control box and heat shield fitted in the lower casing height position 4 Installation 9863 SIDE CASINGS FITTING Diagram 4 7 MAX SIDE CASING R H MIN BOILER PLINTH FRONT CASING BRACKE...

Page 14: ...crew select and fit appropriate restrictor CFF100 marked D CFF115 marked E then secure in place with the previously removed screw To connect a condensate drain remove plastic end stop by depressing th...

Page 15: ...rain should be fitted To use the condensate drain connection on the chimney flue adapter remove end stop see diagram 4 13 A 22mm plastic overflow pipe should be used to fit on to the drain connection...

Page 16: ...ke sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth cond...

Page 17: ...x Diagram 6 1 BOILER COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J...

Page 18: ...has lit making sure that all other gas burning appliances and pilot lights are off Gas rate Buckingham 4 CFF100 3 3m3 h 115ft3 h Buckingham 4 CFF115 3 8m3 h 136ft3 h is for guidance only dependent on...

Page 19: ...operate on mains voltage terminals will become live Switch on the electrical supply and gas supply then operate the boiler On completion of the test switch off the electrical supply and gas supply re...

Page 20: ...ng back to disengage the retaining lugs then lift up When replacing the flue hood ensure that it rests on the guides and that the rear of flue hood is located under the pegs at the rear and pushed dow...

Page 21: ...elevant instructions in sections 8 3 and 8 4 8 3 Burners and Injectors Remove the screws and nuts securing the burner support bracket to the combustion chamber cover see diagram 8 9 Remove the graphit...

Page 22: ...calling for heat and circuit water is cold If Reset LED is lit check water system for overheating reset by turning temperature control knob off and on If the LED coding is showing an ignition failure...

Page 23: ...cause the burner to go out Operationwillnormallyresumeontherestorationoftheelectrical supply Iftheburnerdoesnotrelightafteranelectricalsupplyfailureand theredneononthecontrolpanelislit turntheburnert...

Page 24: ...ECTRODE IGNITION ELECTRODE BLOCK CONNECTOR THERMISTOR AIR PRESSURE SWITCH 3 15A FUSE BURNER LIT INDICATOR RESET INDICATOR JUMPER POSITION p bk bk w bk bk b r g bk b LS LIVE Switched N LS N g y g y g y...

Page 25: ...ring screws two on control box two on the heat shield and lift off see diagram 10 1 Carefully pull the boiler temperature control knob away from the P C B CONTROL BOX COVER CONTROL BOX SECURING SCREWS...

Page 26: ...ith the clear tube from the air pressure switch to the front fan connection as shown in diagram 10 5 and the electrical connections are made as shown in wiring diagram 9 4 10 9 Fan Refer to the releva...

Page 27: ...ame and serial number information from the data label The data label is positioned on the heat shield see diagram 6 1 11 10 Key No Part No Description GC Part No 1 2000461898 Multifunctional control 2...

Page 28: ...28 2000225117B Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Reviews: