background image

10

2000225117B

3 Flue & Ventillation

3.3 Timber Frame Buildings

If the boiler is to be installed in a timber frame building it should
be fitted in accordance with the Institute of Gas Engineers
document IGE/UP/7/1998. If in doubt seek advice from the local
gas undertaking or Halstead Boilers Ltd.

3.4 Ventilation for Boiler Installed in a Room
or Space

If the boiler is to be installed in a room or space a purpose
designed permanent ventilation opening, to supply air for
combustion, must be provided on an outside wall to external air,
refer to the current issue of BS5440 Part 2 for details.

The opening may be directly into the room or the space
containing the boiler, or an outside wall of an adjacent room or
space which has an internal permanent air vent, of the same
size, into the room or space containing the boiler.

Do not ventilate through a bedroom, bedsitting room, private
garage or a room containing a bath or shower.

When the boiler is installed in a room or internal space already
containing other fuel burning appliances then the air supply of
such appliances must be taken into account.

The ventilation opening areas are given in “Air Vent Table ”.  The
figures quoted refer to the minimum acceptable effective area.

3.5 Ventilation for Boilers Installed in a
Compartment

When the boiler is fitted in a compartment, high and low level
purpose designed, permanent openings must be provided to
supply air for combustion and compartment ventilation.

The air vents must have minimum areas, see “Compartment Air
Vent  table".  The figures quoted refer to the minimum acceptable
effective area.

Both the high and low level openings must communicate with
the same room, or must both be on the same wall to outside air.

If air vent grilles are fitted to a cavity wall, the opening through
the wall must be ducted.

Where ventilation air to a compartment is taken from a room or
space, then the room or space must be fitted with a ventilation
opening as specified in “Air Vent Table”.

For information regarding compartment requirements refer to
the appropriate section of the current issue of BS6798.

3.6 Ventilation for Boilers installed in a
Cupboard

For minimum ventilation and clearances for cupboard installation
refer to section 1.8 and diagram 1.7.

3.7 Extract Fans

If an extract fan is fitted in the premises, there is a possibility that
if adequate inlet openings are not provided, spillage of the
products from the boiler could occur.

When openings are fitted in accordance with the current issue
of BS5440 Part 2 and this section, extract fans should not cause
down draught, but where such fan installations are found, a
spillage test must be carried out in accordance with the current
issue of BS5440 Part 1 and any corrective work done.

FROM
OUTSIDE

COMPARTMENT AIR VENT TABLE

COMPARTMENT
VENTILATION
REQUIREMENTS

VENTILATION
FROM ROOM
OR SPACE

HIGH LEVEL

LOW LEVEL

VENT AREA

VENT AREA

CFF100 162cm

2

25in

2

323cm

2

50in

2

AIR VENT TABLE

FOR ROOM SPACE INSTALLATIONS

126cm

2

EFFECTIVE AREA OF VENT

20in

2

CFF100

152cm

2

24in

2

CFF115

CFF100 323cm

2

50in

2

646cm

2

100in

2

CFF115 374cm

2

58in

2

747cm

2

116in

2

CFF115 187cm

2

29in

2

374cm

2

58in

2

Summary of Contents for Buckingham 4

Page 1: ...of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f t w i t h t h e u s...

Page 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Page 3: ...the whole system including the boiler be drained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensuretheco...

Page 4: ...te control Note If the boiler is turned OFF at the boiler temperature control wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic light...

Page 5: ...ety Installation and Use Regulations The appropriate Buildings Regulations either The Building Regulations The BuildingRegulations Scotland The Building Regulations Northern Ireland The Water Fittings...

Page 6: ...TIONS MIN MAX To floor level FLOOR LEVEL 9922 1 General Data Diagram 1 5 MINIMUM CLEARANCES LEVEL WITH WORKTOP 9923 494 MIN 494 MIN CUPBOARDS WORKTOP 10 10 BOILER BOILER 5 MAX 900 MIN 860 Diagram 1 3...

Page 7: ...l obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartment modified fo...

Page 8: ...essarily high when the central heating pump is off The domestic primary flow and return must be 28mm o d The installation must comply with the current issue of BS5546 and BS6700 see diagram 2 1 If the...

Page 9: ...must be adequately sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge height but at the least above the eaves of...

Page 10: ...ir vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both the high and low level openings must communicate with the same room or m...

Page 11: ...emaining lower connections may be used for the gravity domestic hot water return Fit plugs into any unused boiler tappings 4 3 Water Connections Fully Pumped Systems Fit suitable fittings into the boi...

Page 12: ...gas pipework must be along the left hand side of the boiler 4 Installation No 8 SCREW 4 Diagram 4 4 PIPEWORK CASING CLEARANCES 9860 Diagram 4 6 PLASTIC PEG PLASTIC PEG SPRING CLIP SIDE CASING R H SHOW...

Page 13: ...e factory with the control box and heat shield fitted in the lower casing height position 4 Installation 9863 SIDE CASINGS FITTING Diagram 4 7 MAX SIDE CASING R H MIN BOILER PLINTH FRONT CASING BRACKE...

Page 14: ...crew select and fit appropriate restrictor CFF100 marked D CFF115 marked E then secure in place with the previously removed screw To connect a condensate drain remove plastic end stop by depressing th...

Page 15: ...rain should be fitted To use the condensate drain connection on the chimney flue adapter remove end stop see diagram 4 13 A 22mm plastic overflow pipe should be used to fit on to the drain connection...

Page 16: ...ke sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth cond...

Page 17: ...x Diagram 6 1 BOILER COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J...

Page 18: ...has lit making sure that all other gas burning appliances and pilot lights are off Gas rate Buckingham 4 CFF100 3 3m3 h 115ft3 h Buckingham 4 CFF115 3 8m3 h 136ft3 h is for guidance only dependent on...

Page 19: ...operate on mains voltage terminals will become live Switch on the electrical supply and gas supply then operate the boiler On completion of the test switch off the electrical supply and gas supply re...

Page 20: ...ng back to disengage the retaining lugs then lift up When replacing the flue hood ensure that it rests on the guides and that the rear of flue hood is located under the pegs at the rear and pushed dow...

Page 21: ...elevant instructions in sections 8 3 and 8 4 8 3 Burners and Injectors Remove the screws and nuts securing the burner support bracket to the combustion chamber cover see diagram 8 9 Remove the graphit...

Page 22: ...calling for heat and circuit water is cold If Reset LED is lit check water system for overheating reset by turning temperature control knob off and on If the LED coding is showing an ignition failure...

Page 23: ...cause the burner to go out Operationwillnormallyresumeontherestorationoftheelectrical supply Iftheburnerdoesnotrelightafteranelectricalsupplyfailureand theredneononthecontrolpanelislit turntheburnert...

Page 24: ...ECTRODE IGNITION ELECTRODE BLOCK CONNECTOR THERMISTOR AIR PRESSURE SWITCH 3 15A FUSE BURNER LIT INDICATOR RESET INDICATOR JUMPER POSITION p bk bk w bk bk b r g bk b LS LIVE Switched N LS N g y g y g y...

Page 25: ...ring screws two on control box two on the heat shield and lift off see diagram 10 1 Carefully pull the boiler temperature control knob away from the P C B CONTROL BOX COVER CONTROL BOX SECURING SCREWS...

Page 26: ...ith the clear tube from the air pressure switch to the front fan connection as shown in diagram 10 5 and the electrical connections are made as shown in wiring diagram 9 4 10 9 Fan Refer to the releva...

Page 27: ...ame and serial number information from the data label The data label is positioned on the heat shield see diagram 6 1 11 10 Key No Part No Description GC Part No 1 2000461898 Multifunctional control 2...

Page 28: ...28 2000225117B Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Reviews: