12
2000225117B
CASING BRACKETS FITTING
Diagram 4.5
9858
FRONT
CASING
BRACKET
No.8
SCREW
(4)
CAPTIVE
NUT
UPPER CASING
BRACKET
CAPTIVE
NUT
4.5 Pipework
It is essential that any pipework or fittings do not project more
than shown in diagram 4.4.
Do not route any pipework, water or gas, across the front of the
combustion chamber cover.
The gas pipework must be along the left hand side of the boiler.
4 Installation
No.8
SCREW
(4)
Diagram 4.4
PIPEWORK CASING
CLEARANCES
9860
Diagram 4.6
PLASTIC
PEG
PLASTIC
PEG
SPRING
CLIP
SIDE
CASING
(R.H.SHOWN)
UPPER VIEW
LOWER VIEW
SPRING
CLIP
SIDE
CASING
(R.H. SHOWN)
IN-FILL
PANEL
IN-FILL
PANEL
4.6 Casing Brackets
Fit the two upper and two front casing brackets shown in
diagram 4.6, using the No.8 screws provided.
NOTE: The screws will already be fitted.
Push the captive nuts, supplied loose, on to the casing brackets
as shown in diagram 4.5.