Halsey Taylor RC8AQA Owner'S Manual Download Page 4

PAGE 4

RC8AQ*A     RC12AQ*A

97884C (Rev. A - 3/06)

1.  

Familiarize

 yourself with the RC Wallframe which should already be in place in the wall.  If not, refer to the

“RC Wallframe” Installation Instructions before proceeding.

2.  

Determine

 location of rough plumbing.  At this point, you should decide which style trap you plan to use.  For

easier installation, we recommend the use of a swivel trap.

3.  

Install

 the basin (See Fig. 7).  Hold the basin flush against the wall, positioning the top edge just above the upper

edge of the wallframe.  Then slide the basin down slowly until it engages the hanger bracket.  Be sure the basin is
firmly engaged before releasing it.

4.  

Finish

 securing basin in place.  Align the brackets at the bottom of the basin with the bracket on the frame.  Fasten

the brackets together using screws and speednuts (provided with fountain).

5.  

Install

 tailpiece assembly.  Slide the slip nut and gasket from the trap onto the tailpiece.  Insert the tailpiece

assembly into the trap and align its other end with the drain hole in the basin.  Place rubber gasket between the
tailpiece assembly and the basin, then screw in the drain plug from above.  Tighten the drain plug.  Tighten slip
nut and swivel joint.  Snap the strainer plate into the drain plug.

6.  

Install

 a service stop (not provided) on the supply water inlet line.  Turn on supply water and flush thoroughly.

7.  

Install

 refrigeration unit.  Slide refrigeration unit into the wallframe and position tight against left side and flush

with the front edge of wallframe.  WARNING: Adequate space must be maintained behind the refrigeration unit for
air circulation.

8.  

Water

 supply connections (See Figs. 8, 9, & 10)

RC8A Models

 – 

Make connections between remote chiller and building supply line.

 Inlet port is marked on the

chiller (1/4” O.D. copper tube). Bend the copper tube (provided) at an appropriate length from chiller to opening in
frame. Install the in-line strainer (provided with chiller) by pushing it in until it reaches a positive stop, approxi-
mately 3/4” (19mm) on the marked chiller inlet port. Connect building supply line to strainer. 

DO NOT SOLDER

TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.

 (See Fig. 8)

Make connections between remote chiller outlet tube and fountain.

 Outlet port is marked on the chiller (1/4” O.D.

copper tube). Install a 1/4” x 1/4” union (provided) on the marked chiller outlet port. Insert the 1/4” poly tubing
coming from the fountain into the union. Turn on the water supply and check for leaks.

 DO NOT SOLDER

TUBES INSERTED INTO THE UNION AS DAMAGE TO THE O-RINGS MAY RESULT.

 (See Fig. 8)

RC12A Models

 – 

Make connections between precooler and building supply line.

 Install the in-line strainer

(provided with chiller) by pushing it in until it reaches a positive stop, approximately 3/4” (19mm) on the precooler
inlet tube. Connect building supply line to strainer. 

DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS

DAMAGE TO THE O-RINGS MAY RESULT.

 (See Fig. 10)

Make connections between precooler and remote chiller.

 Inlet port is marked on the chiller (1/4” O.D. copper

tube). Bend the copper tube (provided) at an appropriate length from chiller and install a 1/4” x 3/8” union (pro-
vided) on the marked chiller inlet port. Insert the precooler outlet tube into the union. 

DO NOT SOLDER TUBES

INSERTED INTO THE UNION AS DAMAGE TO THE O-RINGS MAY RESULT.

 (See Fig. 10)

Make connections between remote chiller outlet tube and fountain.

 Outlet port is marked on the chiller (1/4” O.D.

copper tube). Install a 1/4” x 1/4” union (provided) on the marked chiller outlet port. Insert the 1/4” poly tubing
coming from the fountain into the union. Turn on the water supply and check for leaks.

 DO NOT SOLDER

TUBES INSERTED INTO THE UNION AS DAMAGE TO THE O-RINGS MAY RESULT.

 (See Fig. 10)

9.  

GF Model Only.

  

Make connections between remote chiller outlet tube and fountain.

 Outlet port is marked on the

chiller (1/4” O.D. copper tube). Install a 1/4” x 1/4” tee (provided) on the marked chiller outlet port. Insert the 1/4”
poly tubing coming from the fountain into the tee. Connect glass filler line to outlet on tee. Install a 1/4” x 3/8” union
(provided) on the glass filler outlet line. Insert a piece of 1/4” poly tubing from the tee to the union. Turn on the
water supply and check for leaks.

 DO NOT SOLDER TUBES INSERTED INTO THE UNION/TEE AS DAMAGE TO THE

O-RINGS MAY RESULT.

 (See Fig. 9)

10. 

Open

 service stop and operate push button to purge air.  Check thoroughly for leaks.

INSTALLATION INSTRUCTIONS

FOR THE

RC MODELS DRINKING FOUNTAIN

(refrigerated and non-refrigerated)

Summary of Contents for RC8AQA

Page 1: ...NT INSTALLER PLEASE NOTE THE GROUNDING OF ELECTRICAL EQUIPMENT SUCHAS TELEPHONE COMPUTERS ETC TO WATER LINES ISA COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILD...

Page 2: ...cup dispenser model without glass filler plumbing continue with step no 5 4 Cup dispenser Models Install rough plumbing to cup dispenser See Fig 15 for location of waste water outlet 5 Cut plastic ti...

Page 3: ...sted to meet local codes see Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHILLER WAT...

Page 4: ...MAYRESULT See Fig 8 Make connections between remote chiller outlet tube and fountain Outlet port is marked on the chiller 1 4 O D copper tube Install a 1 4 x 1 4 union provided on the marked chiller...

Page 5: ...ll lower stream height For best adjustment stream height should be approxi mately 1 1 2 38mm above the bubbler guard See Fig 6 12 Connect refrigeration unit to electrical supply and check for proper o...

Page 6: ...Rev A 3 06 RC12A TO BUBBLER CHILLER OUTLET 20 16 23 FIG 8 FIG 9 FIG 10 TO BUBBLER CHILLERINLET CHILLEROUTLET 20 24 23 9 TO GLASSFILLER TO BUBBLER CHILLERINLET CHILLER OUTLET 20 16 25 20 CHILLER INLET...

Page 7: ...waste bin 2 Shim along the bottom and side of cup dispenser as required to obtain a good alignment with previously installed drinking fountain Be sure to check for proper operation of access door befo...

Page 8: ...en adjusted to meet local codes see Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHIL...

Page 9: ...suspend cup dispenser via the mounting slots be sure to shim along bottom edge to bear the weight of the cup dispenser 6 Secure cup dispenser in place Use lag screws or bolts as required by wall cons...

Page 10: ...12 Disp Cup w GF Provisions See Fig 11 Assy Valve Push Back Nut Hex Gasket Gasket Drain Gasket Slip Nut Nut Hex Strainer Plate Tailpipe 1 1 4 x 4 Nut Slip 1 1 2 Plug Drain 1 1 2 GF Tube for 14700 Dis...

Page 11: ...been adjusted to meet local codes See Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT C...

Page 12: ...sy Bubbler 8880 Fitting Union 1 4 Fitting Union 1 4 x 3 8 Fitting Tee 1 4 Sound Dampening Pad TROUBLE SHOOTING AND MAINTENANCE Orifice Assy Mineral deposits on orifice can cause water flow to spurt or...

Reviews: