background image

4

May we congratulate you on your new greenhouse

GB

USA

Congratulations On Your Choice Of Greenhouse 

Juliana  Drivhuse  A/S  is  a  privately  owned  Danish 
company established in 1963. At Juliana Drivhuse we 
design,  develop  and  manufacture  our  greenhouses 
based  on  principles  of  simplicity,  aesthetics, 
functionality  and  quality.  Over  the  years,  Juliana 
Drivhuse has acquired several competing companies, 
so that today we offer three brands: Halls, Juliana and 
Gabriel Ash. Each brand contains products with unique 
designs  and  functionalities,  but  where  the  common 
feature is a correlation between quality and price. 
All  products  are  designed  and  manufactured  to  last 
for  many  years  and  form  the  framework  for  people 
and the good life, whether it is primarily for cultivation 
or as an oasis in the garden. On www.juliana.com you 
can  read  more  about  the  company,  the  individual 
brands,  and  the  wide  range  of  accessories  available 
for our greenhouses.

This Installation Manual 

When assembling your new greenhouse, you need to 
follow these instructions step by step. You will find all 
bolts, nuts and fittings in a separate box. 

NOTICE:

  These  instructions  might  be  designed  for 

several sizes of the same greenhouse model. 

All illustrations are marked with the following symbol: 
Seen from the inside:             Seen from the outside:

If  a  component  from  a  box  is  to  be  used  at  a  later 
time in the assembly it is indicated by the following 
symbol:
  

Safety Precautions

• Only carry out assembly in dry and calm weather.  
• Make sure you have an assistant to help you.
• Always wear work gloves while glazing. Greenhouse 
glass has sharp edges, especially if it breaks.  
• Assistants, and especially children, must be warned 
that broken glass presents a safety hazard. Pick up all 
broken glass at once and remove it with care. 
• Any ladders used must be placed on a level surface. 

Location

The  right  location  of  the  greenhouse  is  important 
to  create  the  best  growth  conditions  for  plants  and 
ensure the longevity of the greenhouse. 
The greenhouse must be placed in as sunny a position 
as possible and shielded from strong winds. As far as 
possible,  avoid  positioning  the  greenhouse  under 
trees  as  the  shade  will  encourage  algae  growth. 
Likewise, fallen branches and leaves can damage the 
greenhouse and clog up the gutters. 
We recommend that you locate the greenhouse on 
your  favourite  spot  in  your  garden,  especially  if  you 
want to use the greenhouse for purposes other than 
growing plants. 

IMPORTANT:

  Before  installing  the  greenhouse  you 

must create a flat and true surface at least as big as 
the external dimensions of the greenhouse - this will 
ease the setup of the greenhouse.

Base 

There  is  not  a  base  included  with  this  product. 
However,  one  of  our  pre-fabricated  bases  can  be 
purchased  separately.  If  you  purchase  our  pre-
fabricated base anchor holes must be deep enough 
to extend below the frost line. Follow measurements 
shown on the following pages. All measurements are 
external measurements.   
If our pre-fabricated base is used this is attached to 
the greenhouse at every vertical glazing bar as shown 
on drawing A/B. 
The best assembly order: 

1.

 Ensure level ground. 

2.

 Assemble base and ensure measurements as show 

on  drawing.  Make  sure  diagonal  measurements  are 
identical. 

3.

 Mark holes and move the base.

4.

  Dig  holes  to  extend  below  the  frost  line.  Follow 

local recommendations.

5.

 Add a bend on the end of the ground anchors as 

shown on the drawing. 

6.

 Place base with ground anchors above holes.

7.

  Make  sure  that  the  base  is  100%  level  and  at  a 

straight angle. Make sure diagonal measurements are 
identical.

8.

 Fill up the holes with concrete. 

Example:  a  hole  with  dimensions  ø150  mm  and 
900mm  in  depth  needs  approximately  16  liters  of 
concrete.

9.

 Make sure that the base is still 100% level and at a 

straight angle. Make sure diagonal measurements are 
still identical.

Upon  recommended  time  of  curing  you  may  start 
assembling your greenhouse. 

Locating The Greenhouse On A Solid Base

If the greenhouse is not going to be concreted down, 
it must be secured using suitable brackets. Brackets/
bolts are not part of this purchase. If a pre-fabricated 
base is used ground anchors should be cut off with a 
hacksaw at the same height as the base. 
Pre-fabricated  base  is  designed  for  casting  and 
therefore additional drilling and purchase of materials 
for this purpose is to be expected. Be aware that most 
insurance companies do not cover greenhouses that 
do not have a cast base.

Order of Assembly 

Follow the assembly order as shown on the following 
pages. 
Place  components  as  shown  on  the  drawing  and 
then assemble the section in the order shown in the 
pictures. Do not tighten the nuts completely until the 
entire section is assembled. 
When  all  sections  are  complete  the  body  of  the 
greenhouse can be assembled. 

NOTICE:

  In  several  places  the  assembly  instruction 

shows that extra bolts must be inserted in the profiles. 
These are to be used for attaching other parts later in 
the process. 

Doors and Windows  

Add  grease  on  the  screws  for  the  door  to  ease 
assembly.  Doors and vents should be glazed during 
the initial assembly. 

IMPORTANT: 

Before  glazing  make  sure  that  the 

gables  and  sides  are  level  and  straight,  and  that 
door(s) and window(s) work perfectly. 
A greenhouse should never be left partially glazed. 

Glazing 

1.

 Clean glass and profiles with ethanol.

2.

 Fit one glass at a time – add butyl tape (20-1230) 

on vertical profiles.  

3.

 Fit the glass and finish with cappings. 

Recommended  order  of  glazing:  roof  –  sides  – 
gables. 
If  you  accidentally  break  a  pane,  carefully  pull  the 
broken glass outwards. Clean the profile completely 
before fitting a new pane of glass.

Polycarbonate Installation  

The illustrations show how to fit the sheets and strips. 
If adjustment is necessary use a fine-tooth saw. 

NOTICE:

 To avoid the growth of algae, do not allow 

the polycarbonate sheets to come into contact with 
the ground.

If desired, the sheets may be sealed against insects. 
Seal  the  top  using  aluminium  tape  or  silicone.  The 
bottom  should  only  be  sealed  with  air-strip  tape  to 
allow condensation to escape.

Tools

The  tools  needed  to  assemble  the  greenhouse  are 
shown on the following pages. 

Tips and Tricks

See  www.juliana.com  for  more  tips  on  assembly  of 
your greenhouse.

Maintenance 

• Grease the hinges of the doors, lock and 
– if included – sliders approximately every 6 months.
• Tighten bolts/nuts.  
• Clean the gutters from leaves etc. 
• Adjust windows if necessary. 
• Replace broken glass. 
• Clean the greenhouse before and after the growing 
season. 

Winter and Storm Protection 

If you anticipate snow and/or a storm we recommend 
the following: 
• Support the roof section.
• Remove larger amounts of snow from the roof. 
• Take precautions to prevent snow falling from e.g. 
a tree or roof. 
• Remove the cylinders from the automatic window 
openers (accessory). 
•  Secure  door(s)  and  window(s)  to  prevent  wind 
damage to the greenhouse. 

Please  note  that  not  all  insurance  companies 
automatically cover greenhouses.  

12-year Guarantee  

A full description of the guarantee can be found on 
www.juliana.com. 
Provided  that  the  greenhouse  is  assembled  and 
maintained  according  to  the  requirements,  the 
greenhouse  is  covered  by  a  12-year  guarantee.    In 
case  of  missing  parts/defects  this  must  be  reported 
immediately.
General  maintenance  of  the  greenhouse  such 
as  cleaning,  lubrication,  post-tensioning  of  nuts/
screws must be complied with, as this may affect the 
structural quality of the greenhouse and its resistance 
to wind and snow load. 
 

Please note that the guarantee does not cover; 

•  Damage  and  functional  problems  due  to  lack  of 
lubrication and maintenance. 
• Any paintwork is covered by a 2-year guarantee. 
• Nuance differences in colour may occur and there 
may be small marks on the profiles due to the painting 
process. This is not covered by the guarantee. 
•  Glass,  polycarbonate,  freight,  assembly,  possible 
removal,  possible  consequential  damage,  labour 
costs, etc.
•  Parts  damaged  by  external  influences,  such  as: 
other  building  parts,  climate  impacts,  vandalism, 
force  majeure  or  other  external  conditions.  E.g. 
remember  to  remove  snow  from  the  roof  to  avoid 
possible breakage due to excessive weight. 
•  Wear  parts  (such  as  handles,  wheels,  sliders, 
cylinders  and  locking  devices).  Wear  parts  must  be 
replaced  on  a  regular  basis  depending  on  use  and 
operation. 
• Product defects arising from incorrect/inappropriate 
use of parts. 

NOTICE:

  a  greenhouse  is  a  single-skin,  dry-build 

construction  that  is  not  100%  dense.  Depending 
on  weather  conditions,  leaks  may  occur  at  roofs, 
windows, doors and corners. 

Complaints 

All  our  greenhouses  are  built  according  to  the 
highest  quality  standards.  However,  should  you 
experience any problems, please contact your dealer 
at once. When describing the defect, please state the 
greenhouse model and component number. 

Congratulations on your new greenhouse, which we 
hope will bring you great joy for many years to come.

Summary of Contents for 10536017

Page 1: ...1 2 m 26 0 8 m 24 Qube Lean to 14012022 1 00 1...

Page 2: ...www hallsgreenhouses com Please refer to website for the most up to date instruction...

Page 3: ...tegningen og saml derefter sektionen i den r kkef lge billederne viser Undlad at stramme m trikkerne helt f r hele sektionen er samlet N r alle sektioner er klar kan husets skelet samles BEM RK Flere...

Page 4: ...purpose is to be expected Be aware that most insurance companies do not cover greenhouses that do not have a cast base Order of Assembly Follow the assembly order as shown on the following pages Place...

Page 5: ...Montierungsreihenfolge des Hauses Folgen Sie die Montagereihenfolge wie in der Montage anleitung angegeben Legen Sie die Komponenten wie in den Zeichnungen angegeben und sammeln Sie danach die Sektio...

Page 6: ...ringsf ljden i manualen L gg ut delarna enligt ritningen och montera d refter sektionen i den ordning som bilderna visar Undvik att dra t muttrarna helt innan hela sektionen har monterats N r alla sek...

Page 7: ...sur les illustrations Ne serrer compl tement les vis et boulons que lorsque la section enti re est assembl e Lorsque toutes les sections sont termin es la structure de la serre peut alors tre assembl...

Page 8: ...montagevolgorde zoals aangegeven in de handleiding Leg de onderdelen neer zoals op de tekening en zet het gedeelte daarna in elkaar in de volgorde van de afbeeldingen Draai de moeren pas helemaal vas...

Page 9: ...ettua perustusta Kasvihuoneen asennusj rjestys Noudata k ytt ohjeen asennusj rjestyst Aseta osat piirustuksen mukaisesti ja kokoa sitten lohkot kuvien osoittamassa j rjestyksess l kirist liitoksia enn...

Page 10: ...undamentu Kolejno monta u szklarni Nale y przestrzega kolejno ci monta u przedstawionej w instrukcji U o y elementy w spos b pokazany na rysunku a nast pnie zmontowa sekcj w przedstawionej kolejno ci...

Page 11: ...www hallsgreenhouses com Please refer to website for the most up to date instruction...

Page 12: ...33 38 19 22 1 2 m2 26 0 8 m2 24 Anbefalet V rkt j Recommended Tools Empfohlen Werkzeug RekommenderasVerktyg Recommand s Outillage Aanbevolen Gereedschap Suositellut Ty kalut Zalecane Narz dzia 12 Over...

Page 13: ...13 134 625 Oversigt Overview bersicht versikt D tails Overzicht Sis llys Zawarto...

Page 14: ...S 1 341S 00310341S 1 1 342S 00310342S 1 1 889S 00500889S 2 2 989S 00500989S 1 2 F00040 F00040 1 1 995 00500995 18 20 996 00500996 18 20 280 00402280 24 32 643S 00510643S 1 2 59S 20 40010595 59S D r Do...

Page 15: ...20 1213 20 1214 20 1215 4 1 3 2 2 1 2 4 100 1 4 1 3 2 SUB209 F018104 F01895 F018175 F018189 F018117 F018166 F018183 321S 501S 1 2 20 1020 F018176 F01894 625 11 16 2 2 20 1251 F018176 20 1250 1 2 F0181...

Page 16: ...0 90 1890 618 618 654 649 643S 613S 650S 0 8 m 24 1997 1997 1410 643S 613S 649 643S 624 613S 608S 619S 649 613 FUNDAMENT BASE EMBASE FUNDERING PERUSTUS Tilbeh r Accessories Zubeh r Tillbeh r Accessoir...

Page 17: ...x2 619S 608S 608S 889S 995 996 643S 613S 995 996 643S 989S 2x4 FUNDAMENT BASE EMBASE FUNDERING PERUSTUS 889 114 2 613S 345 345 345 M6 M6 x 10mm 24 1x6 18 18 1 1 1 1 1 1 280 F00040 989S 996 341S 613 6...

Page 18: ...2S 989S 995 996 613S 643S 643S 889S 995 996 643S 613 643S 995 996 643 643S 989S 2x6 2 4 3 1 2 1 889 114 2 643S 345 345 345 M6 M6 x 10mm 32 1x6 20 20 2 1 1 1 2 2 280 F00040 989S 996 341S 643 650 613 mm...

Page 19: ...26 01S 321S 20 1256 625 697 632 180 24 M6 x 15 M6 3 5 mm x 16 mm 1 2 2 1 0 8 m2 24 1 1 2 2 1 1 1 1 156 mm 24 mm 625 697 SUBASM 01 x1 632 32S 20 1256 625 697 01S Forberedelse Preparation Vorbereitung...

Page 20: ...24 mm 632 321S 20 1256 625 697 01S 625 697 SUBASM 02 x1 0 8 m2 24 1 2 m2 26 01S 321S 20 1256 625 697 632 180 24 M6 x 15 M6 3 5 mm x 16 mm 1 1 1 2 2 2 2 1 1 1 1 1 Forberedelse Preparation Vorbereitung...

Page 21: ...20 1257 02S 501S 20 1257 625 697 632 180 24 M6 x 15 M6 3 5 mm x 16 mm 0 8 m2 24 1 1 2 2 1 1 1 2 m2 26 1 2 2 1 1 1 156 mm 24 mm 632 501S 20 1213 625 697 02S 20 1257 SUBASM 03 x1 Forberedelse Preparatio...

Page 22: ...20 1257 0 8 m2 24 1 2 m2 26 02S 501S 20 1257 625 697 632 180 24 M6 x 15 M6 3 5 mm x 16 mm 1 1 1 2 2 2 1 1 1 1 1 2 156 mm 24 mm 632 501S 20 1213 625 697 02S 20 1257 SUBASM 04 x1 Forberedelse Preparatio...

Page 23: ...23 1 2m 26 34 0 8m 24...

Page 24: ...99S 134 697 800mm 134 12mm 30 6S 697 625 99S 51S 598 1 31S 1740 1 1 19S 640 1 615 1 99S 1862 30 6 mm 0 8 m2 24 1 1 SUBASM 02 SUBASM 04 0 8 m2 24 SUBASM 02 3 4 5 6 1 2 SUBASM 04 1 1 19S 99S 31S 30 6S 5...

Page 25: ...BASM 04 SUBASM 04 51S 99S 99S 20S 20S 51S 697 697 20 1254 SUBASM 02 51S 134 134 625 697 51S 99S 697 697 20 1255 SUBASM 02 99S 134 697 19S 31S 19S 99S 134 697 Gavl Gable Giebel Gavel Le pignon Gevel P...

Page 26: ...el P ty Szczyt LH 99S 697 625 12mm 30 5S 102m m 20S 99S 99S 134 697 800mm 800mm 134 1 1 1 8 51S 7 6 5 99S 99S 2 19S 30S 4 0 8 m2 24 51S 598 1 31S 1740 1 1 19S 640 1 1 99S 1862 mm 1 1 SUBASM 01 SUBASM...

Page 27: ...n Gevel P ty Szczyt LH 134 134 SUBASM 03 SUBASM 03 51S 99S 99S 20S 20S 51S 697 697 20 1254 SUBASM 01 51S 134 134 625 697 51S 99S 697 697 20 1255 SUBASM 01 99S 134 697 20 1215 134 697 19S 31S 19S 99S 1...

Page 28: ...SUBASM 06 120mm 00S 09S 09S 99S 625 99S 697 20 1250 697 134 134 697 1 19S 00S 99S 32 7S 2 3 09S 0 8 m2 24 20 1250 00S 1259 1 09S 615 1 99S 1862 1 1 32 7S 1212 19S 640 1 mm 0 8 m2 24 For Front Vorder...

Page 29: ...SUBASM 06 SUBASM 05 2 1 SUBASM 05 SUBASM 06 134 697 PZ2 2 5 3 mm 697 632 625 SUBASM 06 SUBASM 05 134 697 697 134 SUBASM 05 SUBASM 06 Samling Assemble Verbinden Montera Assemblege Monteren Kokoaminen M...

Page 30: ...30 31S 99S 134 697 32 7S 32 7S 31S 99S 697 632 SUBASM 01 PZ2 2 5 3 mm 134 SUBASM 06 619 3 1 4 2 5 0 8 m2 24 Samling Assemble Verbinden Montera Assemblege Monteren Kokoaminen Monta stela a...

Page 31: ...31 31S 09S 30 6S 625 F00040 697 697 F00040 697 134 09S 99S 00S 134 697 19S 19S 31S 99S 697 134 Samling Assemble Verbinden Montera Assemblege Monteren Kokoaminen Monta stela a...

Page 32: ...32 50S 2 5 mm 134 697 134 99S 134 697 50S 20 1253 51S 598 mm 1 2 m2 26 50S 1212 1 1 1 1 2 3 51S 50S 4 5 0 8 m2 24 Tag Roof Dach Tak Toit Dak Katto...

Page 33: ...33 134 697 51S 99S 134 697 50S 51S 50S 2 5 mm 134 134 99S 697 100 200mm 100 200mm 20 1253 6 7 mm 20 1253 50S 6 7 mm 20 1253 Tag Roof Dach Tak Toit Dak Katto...

Page 34: ...34 1 2m 26...

Page 35: ...99S 134 697 800mm 134 12mm 30 6S 697 625 99S 51S 598 1 31S 1740 1 1 19S 640 1 615 1 99S 1862 30 6 mm 1 2 m2 26 1 1 SUBASM 02 SUBASM 04 1 2 m2 26 SUBASM 02 3 4 5 6 1 2 SUBASM 04 1 1 19S 99S 31S 30 6S 5...

Page 36: ...BASM 04 SUBASM 04 51S 99S 99S 20S 20S 51S 697 697 20 1254 SUBASM 02 51S 134 134 625 697 51S 99S 697 697 20 1255 SUBASM 02 99S 134 697 19S 31S 19S 99S 134 697 Gavl Gable Giebel Gavel Le pignon Gevel P...

Page 37: ...S 102m m 20S 99S 99S 134 697 800mm 800mm 134 SUBASM 01 SUBASM 03 3 5 7 8 1 2 1 1 19S 99S 31S 51S 5 30 5S 1 2 m2 26 51S 598 1 31S 1740 1 1 19S 640 1 615 1 99S 1862 30 5 mm 1 2 m2 26 1 1 SUBASM 01 SUBAS...

Page 38: ...BASM 03 SUBASM 03 51S 99S 99S 20S 20S 51S 697 697 20 1254 SUBASM 01 51S 134 134 625 697 51S 99S 697 697 20 1255 SUBASM 01 99S 134 697 19S 31S 19S 99S 134 697 Gavl Gable Giebel Gavel Le pignon Gevel P...

Page 39: ...0mm 00S 09S 09S 99S 625 99S 697 20 1250 697 134 134 697 134 697 2 3 1 4 5 10S 00S 99S 99S 32S 5 09S 19S 19S 1 2 m2 26 20 1250 20 1250 42 00S 1259 1 09S 615 1 10S 615 1 99S 1862 2 32S 1830 1 19S 640 2...

Page 40: ...40 697 134 19S 99S 20 1215 697 134 32S 32 7S 134 697 99S 697 134 19S 99S For Front Vorder Front Devant Voorkant Edess Przednia...

Page 41: ...41 31S 51S 134 697 32S 32S 31S 51S 697 632 SUBASM 01 PZ2 2 5 3 mm 134 650 2 1 8 5 6 7 3 4 1 2 m2 26 1 2 3 Samling Assemble Verbinden Montera Assemblege Monteren Kokoaminen Monta stela a...

Page 42: ...97 632 SUBASM 01 PZ2 2 5 3 mm 31S 09S 30 6S 625 F00040 697 697 F00040 697 134 09S 99S 00S 00S 99S 10S 134 697 134 697 19S 19S 31S 99S 31S 10S 30 5S 625 F00040 697 697 F00040 Samling Assemble Verbinden...

Page 43: ...43 50S 2 5 mm 134 697 134 51S 134 697 50S 20 1253 51S 598 mm 1 2 m2 26 50S 1830 1 2 3 2 1 1 51S 51S 50S 4 4 5 5 1 2 m2 26 Tag Roof Dach Tak Toit Dak Katto...

Page 44: ...44 50S 2 5 mm 134 134 51S 697 6 7 mm 20 1253 100 300mm 100 300mm 50S 20 1253 20 1253 6 7 mm 99S 134 697 51S 99S 134 697 50S 51S Tag Roof Dach Tak Toit Dak Katto...

Page 45: ...m2 2x4 1 2 m2 2x6 D 2 2 2 2 610 x 616 x 746 12 14 mm 1738 88 3 4 20 1030 595 B G 0 8m2 2x4 1 2 m2 2x6 20 1030 20 1030 A A A A B D A1 A1 A1 88 88 0 8m2 2x4 A D B B B B 20 1030 88 88 88 88 88 458 458 45...

Page 46: ...2 2x4 2x6 m2 2x6 2 3 1 1 1 2 3 1 1 1 437N A 600 2 2 2 5 2 5 1738 88 A G 610 x 1222 1 1 1 1 610 x 454 437N 437N B 437N A 473N 59S 31S 20 1213 X2 2 5 mm 31S 59S 20 1213 X2 SUBASM 06 SUBASM 07 SUBASM 05...

Page 47: ...4 59S 20 1026 59S 20 1223 697 134 20 1204 1740mm 5mm 59S 20 1204 Soapy Water 59S 31S 595mm 59S 134 697 3x 31S 59S 697 697 134 x2 206S x2 SUBASM 06 322 x3 20 1214 x3 57S 631 x3 SUBASM 07 20 1203 31S 13...

Page 48: ...48 88 20 1230 88 D r Door T r D rr Porte Deur Ovi Drzwi...

Page 49: ...7 20 1025 437N A 437N B 437N 602 x3 1645 603 x3 437B 437N A 437N B 437N 602 x3 1645 603 x3 437B 4 5 mm 1 2m 2x6 0 8m 2x4 Afslutning Finishing Fertigstellung Slutf r Aper u Afwerking Viimeistely Wyko c...

Page 50: ......

Page 51: ......

Page 52: ...This product is delivered by a company in the Juliana Group www juliana com...

Reviews: