47
Maintenance and Care
5.3
Maintenance plan
Hako system maintenance,
customer
The following maintenance work must
be completed by the customer at the in-
tervals stipulated.
Activity
Interval
Daily
Check the fuel supply, refill as necessary
o
Check the sweepings container, empty as necessary
o
Check the engine oil level, refill engine oil as necessary
o
Check the coolant level in the cooling system, refill as necessary
o
Check the hydraulic oil level, refill as necessary
o
Clean the dust discharge valve in the air filter
o
Check the engine and hydraulic system for leaks
o