Haklift Oy
Asessorinkatu 3-7
20780 Kaarina, Finland
Tel. +358 2 511 5511
www.haklift.com
Lifting Solutions Group
Axel Johnson International
6. OPERATION
6.1 Control device: Controller
6.2 Operating procedure
The person who is untrained or unfamiliar with the operation procedure is prohibited from operating machine.
˙
Preparation before Working
▪
Check all safety and environmental conditions
▪
Check the load chain and discard should there be any signs of excessive wear, too many broken chain
links, corrosion, or other defects.
▪
Connect the main power source and ensure grounding.
▪
Do not lift loads exceeding the rated load.
▪
Always use power source at the rated voltage.
˙
Up and Down Control Switch
▪
To Lift a Load. Press ▲
Button
▪
To Lower a Load. Press ▼
Button
6.3 Handling precautions
1. Check to ensure that the load point is in the line with the hoist head.
2. When applying a load, it must be directly in line with hoist. Avoid off-center loading of any kind.
3. Take up a slack load chain carefully and start load easily to avoid shock and jerking of hoist load chain. if
there is any evidence of overloading, immediately lower the load and remove the excess load.
4. Do not allow the load to swing or twist while lifting.
5. Do not allow the load and/or attachments to bear against the hook latch and/or hook tip. Apply load to hook
bowl or saddle only.