![background image](http://html1.mh-extra.com/html/hakko-electronics/941/941_instruction-manual_3333113004.webp)
1
4. PART NAMES
5. INITIAL SETUP
A. Iron holder
1. Adjust the height of the iron holder to suit, as
follows:
i. Loosen the adjusting screws.
ii. Set the iron holder to the desired height.
iii. Tighten the screws.
Heat resistant pad
Iron holder
Cleaning
sponge
Tip (not included)
Hakko 911
Soldering iron
Power cord
Fuse
Power receptacle
Station
Power switch
Receptacle
Control card
Card chain
OF
F O
N
Tip tray
3