background image

4

3. Setting the Tube Unit

The tube is double structure. Insert the inside tube into the

hole of the connection, and the outside black tube should

fully cover the screw part of the connection. Be sure that not

to bend the tube.

(a) Attach the Tube to Guide Pipe

Asse’y.

(b) Set the Attachment on the

Handle of Soldering Iron.

NOTE

The Attachment is not necessary if you use HAKKO

MACH-

.

i. Position the attachment on the handle of iron. Decide which

outlet of attachment should use for the tube as the tube

can be pulled out from either way of the attachment. Find

the best position where can connect the tube straight to

the pipe. Be careful not to damage the inner wiring if

replace the tube inside of the attachment.

ii. Secure the attachment. Set the attachment on the handle

securely with clips and adhesive tape on backside of the

attachment. Refer to the following figure on the setting

position of the attachment and the guide pipe. Pay attention

on the setting angle of the guide pipe and the attachment.

4. Connect the Feeding

Nozzle

Insert the feeding nozzle into the feeding unit on the top of

the station, and secure it with screw.

NOTE

Securing the screw excessively may break the feeding

nozzle.

5. Connect the Mini-plug

Insert the mini-plug branching from the tube unit into the

jack of the station.

NOTE

Connect the mini-plug of foot switch to the station if you

use HAKKO MACH-

.

Nozzle

Guide Pipe

Securing Nut for Guide Pipe

Connection

Tube

Attachment

Clips

Guide Pipe Holder

Setting Up the HAKKO 373

Summary of Contents for 373

Page 1: ...l in a safe easily accessible place for future reference CAUTION You must install the Solder Dia Adjustment Ring before use SELF FEEDER TABLE OF CONTENTS Precautions 1 Specifications 1 Names of Parts...

Page 2: ...Specifications Usable Solder Usable solders are as follows Some of the parts should be changed according to the diameter of solder desired to use mm inch 0 6 0 65 0 8 1 0 1 2 1 6 0 024 0 025 0 031 0 0...

Page 3: ...Feed Time Control Knob Mode Switch Power Switch Release Lever Securing Screw Tension Adjustment Knob Tension Gear Guide Shaft Adjustment for the amount of solder return Feed Gear Supply Nozzle Solder...

Page 4: ...and handle and secure it Washer may need depend on the type of iron Please refer to the following figure 3 Setting up should be done while the soldering iron is cool or you may get burnt Do not force...

Page 5: ...inner wiring if replace the tube inside of the attachment ii Secure the attachment Set the attachment on the handle securely with clips and adhesive tape on backside of the attachment Refer to the fol...

Page 6: ...rs e Power switch on and set MODE to MANUAL f Press the trigger switch and feed the solder 7 Changing the Solder Diameter Replace the solder dia adjustment ring when using the soldering iron continuou...

Page 7: ...ts Amount of solder return is adjustable within 0 13 mm 0 0 51 in Solder should be rolled back if the amount of solder return is bigger than the amount of solder feed Please set the amount of solder r...

Page 8: ...907 908 Place the soldering iron in the iron holder so that the right side of the guide pipe holder fits to the right side of the iron receptacle When you want to fit it to the left side of the iron...

Page 9: ...rom the range of 1 2 1 6mm to the range of 0 6 1 0mm Nozzle replace replace replace replace Guide Pipe same same replace replace Tube Unit same same replace replace 2 When you change the Soldering Iro...

Page 10: ...th Switch Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe Asse y Guide Pipe...

Page 11: ...Iron Holder Mini plug Iron Receptacle Feeder Pen A Feeder Pen B Feeder Switch Dia of Solder 0 6 0 65mm 0 8mm 1 0mm 1 2mm 1 6mm 0 6 0 65mm 0 8mm 1 0mm 1 2mm 1 6mm 0 6 0 65mm 0 8mm 1 0mm 1 2mm 1 6mm 0...

Page 12: ...904 Knob 28 B1903 Mini Jack 29 B1906 Switch 220 240V 30 B1487 Power Switch B2604 Power Switch 100 120V 31 B1197 Potentiometer for Feed Speed Control 5K w Nut 32 B1905 Potentiometer for Feed Time Contr...

Page 13: ...roper parts according to the diameter of solder Did you adjust the tension properly Isn t the tube bent or transformed Isn t solder adhered at the feed gear or the tension gear Isn t the nozzle clogge...

Page 14: ......

Page 15: ...JALAN PEMBERITA U1 49 SEKSYEN U1 TEMASYA INDUSTRIAL PARK 40150 GLENMARIE SHAH ALAM SELANGOR DARUL EHSAN WEST MALAYSIA TEL 03 5569 5223 FAX 03 5569 5221 E mail hakkokl tm net my PENANG BRANCH 19 LORON...

Reviews: