MANOK plus
Installation
Order h49 7144.907-333
61
5. Repeat the alignment process.
6. Repeat the face run-out test.
7.6 Installation of the clamping element
A
Clamping head [clamping element]
INFORMATION
Before installing the clamping element, install the
changing part if necessary, otherwise it can no longer
be installed.
Special aids needed:
Changing fixture
1. As described in the »Preparation of the machine for in-
stallation« chapter, prepare for the following steps.
2. Move the clamping device into release position.