18. Reinstall the drum and front panel. Tension
the drum belt.
19. Connect electrical service and turn on gas
supply to the dryer.
20. Check gas valve pressure as follows:
a. Connect manometer to tubing.
b. Start dryer using high temp setting.
c. Pressure should be 12.5±1.5 W.C.
d. Turn off the dryer.
21. Disconnect electrical service and shut off
gas supply to the dryer.
22. Repeat Steps 3 to 9. Remove the tubing
and pressure tap
fitting and replace pressure tap plug.
23. Turn on gas supply and check for leaks
using a soapy solution.
Caution: Do not
use an open flame to check for gas leaks.
24. Shut off gas supply to the dryer.
25. Verify that the dryer conversion has been
completed. Recheck the following:
- Installed Main Burner Orifice #55 (Step 11)
- Installed Regulator Blocking Plug (Step 12)
- Verified gas inlet pressure is 12.5±1.5 W.C.
- Installed three stickers (Steps 13 to 15)
26. Reinstall the drum and front panel. Tension
the drum belt and reinstall the vent panel.
27. Connect electrical service and turn on gas
supply to the dryer.
Figure 6
Presure
Tap Plug
12.5 ± 1.5 W.C.
(31.8 ± 3.8cm W.C.)
U Tube
Manometer
''
''
'' ''
''