After the compressor is started for 5 seconds, the outdoor fan is started at the medium speed at
first, after 30 seconds it begins to control the airflow speed according to the temperature
conditions of the outdoor environment.
Remarks: Ta:The temperature of the outdoor air; Te: The temperature of the outdoor coil.
The temperature of the outdoor
air
Ta
Airflow speed
Ta 22
Low
19
Ta<22
Keeping the speed
16
Ta<22
Medium
14
Ta<16
Keeping the speed
Ta<14
High
Remarks: Ta:The temperature of the outdoor air; Te: The temperature of the outdoor coil.
7.1.3
The control of the outdoor electronic expansion valve
When starting the compressor: the opening size of the valve must be guaranteed to have entered
into the standard opening size, and then the compressor can be started.
When refrigeration is in vain (the machine is shut down or is in the state of retrograde operation),
the opening size of the expansion valve of the indoor unit is 5 steps;
When heating is in vain, the opening size of the expansion valve of the indoor unit is 55 steps;
When the outdoor unit is shut down, the valve is opened completely for 2 minutes, and then
begin initialization.
The scope of refrigerationg valve 90-----480 steps
The scope of heating valve
80-----480 steps
The valves are adjusted according to the degree of superheat
SHa
SHa.
7.1.4
Four way control
For the details of Defrost four-way valve control, see the Defrost process.
Four way working in other ways:
Under the mode of heating, open the four-way valve, when the compressor is not started or
changed to non-heating mode, make sure the compressor is stoped for 2 minutes, and then
close the four-way valve.
The temperature of the
outdoor air
Ta
The temperature of the outdoor
coil Te
Airflow speed
Ta 30
High
26
Ta<30
Keeping the speed
24
Ta<26
Medium
23
Ta<24
Keeping the speed
5
Ta<23
Low
Ta<5
15
Te
Low
15 >Te
Stop
7.1.2.1 The outdoor fan control when refrigerating or dehumidifying
7.1.2.2 The outdoor fan control when heating
Functions and Control
Domestic air conditioner
17
Summary of Contents for 2U14CS4ERA
Page 10: ... Pinping diagrams Domestic air conditioner 4ˊPinping diagrams 8 ...
Page 11: ... Operation range Domestic air conditioner 5ˊOperation range 9 ...
Page 15: ...PCB 2 CN1 CN5 CN6 CN7 CN10 CN11 CN8 CN9 CN2 CN3 CN4 Domestic air conditioner Wiring diagram ...
Page 16: ...0 Wiring diagram Domestic air conditioner ...
Page 35: ...WARNING CAUTION Installations Domestic air conditioner 33 ...
Page 36: ...Installations Domestic air conditioner 34 ...
Page 37: ...Installations Domestic air conditioner 35 ...
Page 38: ...Installations Domestic air conditioner 36 ...
Page 39: ...Installations Domestic air conditioner 37 ...
Page 40: ...Installations Domestic air conditioner 38 ...
Page 41: ...Installations Domestic air conditioner 39 ...
Page 85: ...1 Removal Procedure 1 Domestic Air Conditioner p ...
Page 87: ...Loosen the screws and pull the panel Removal Procedure 3 Domestic Air Conditioner ...
Page 89: ...Removal Procedure 5 Domestic Air Conditioner 2 ...
Page 90: ...Removal Procedure 6 Domestic Air Conditioner 3 ...
Page 91: ...2 Loosen the fixing screws and remove the motor Removal Procedure 7 Domestic Air Conditioner ...
Page 92: ...Removal Procedure 8 Domestic Air Conditioner 4 F M P B ...
Page 93: ...and remove the reactor Loosen the screw Removal Procedure 9 Domestic Air Conditioner ...