Installation Steps and Start-Up Procedures, Cont.
S
S
S
tep 7
Mount the Reverse Osmosis Appliance
Mount the RO Appliance on the cabinet wall using the screws supplied. Leave 3 inches below
the bottom of the filter housing for clearance when changing filters (See Figure 2).
tep 8
Start-Up Procedure
A.
Check all connections to ensure they are tight, with locking clips in place.
B.
Turn on the feed water and check for leaks.
C.
Open the valve on top of the storage tank.
D.
The appliance is now in operation.
tep 9
Operation Procedure
A.
Operation of the appliance will require two to five hours to initially fill the storage tank.
B.
After the storage tank is filled, open the spigot by lifting the black handle to the up position
and drain the tank.
C.
After the tank has drained, return the black handle to the off position.
D.
Allow the storage tank to refill, and drain again. The water is now ready to use.
WaterMax RO Owner’s Manual
11/11/2009
23
Summary of Contents for WATERMAX H2000
Page 44: ...Certificates WaterMax RO Owner s Manual 11 11 2009 44...
Page 45: ...Certificates Cont WaterMax RO Owner s Manual 11 11 2009 45...
Page 46: ...Notes...
Page 47: ...Notes...