hager XEM800 Installation Instructions Manual Download Page 44

Hager Vertriebsgesellschaft mbH & Co.KG

Zum Gunterstal

66440 Blieskastel, Germany

hager.com

Hager AG

Sedelstrasse 2

6020 Emmenbrücke, Switzerland

hager.ch

Summary of Contents for XEM800

Page 1: ...Page 1 44 05 2021 6LE007528B Hager energy storage system XEM800 Hager battery module XEM100 Installation instructions hager com Subject to technical changes flow Energy storage system...

Page 2: ...15 Assembly on a base 18 Inverter assembly 20 Electrical connection 23 Using surge overvoltage modules 24 Connecting the energy storage system to the building network AC connection 25 Connecting photo...

Page 3: ...6LE007528B Certificates and standards 41 Safety 41 Conformity 41 Accessories 42 Maintenance and cleaning 42 Battery recycling 42 Disposal 42 Warranty 42 hager com Subject to technical changes flow Ene...

Page 4: ...ystem is part of the building s energy management system flow and can only be operated and configured in connection with the energy management controller Option 1 PV internal Energy storage Option 2 P...

Page 5: ...ce of less than 30 cm from the inverter for long periods due to potential health risks caused by radiation Failure to comply with these installation instructions may result in damage to the device fir...

Page 6: ...mage and of its mechanical parts and that the original boxes containing the battery modules and inverter are transported in the correct position writing on the box is facing the right way up not upsid...

Page 7: ...wall mounting the energy storge system Size 13 spanner fixing the energy storage system hangers Torx screwdriver T25 attaching the inverter Torx screwdriver T 20 battery clamps in the battery modules...

Page 8: ...housing inverter battery control ler and battery modules The three last components are or will be installed in the housing The following images show the basic structure Figure 2 and Figure 3 1 2 3 4 F...

Page 9: ...for connecting to the power supply 4 MC4 jacks for connecting the photovoltaic modules 8 Battery module 9 Battery connection panel Type label The type label is located on the outside to the right of t...

Page 10: ...the requirements of the applicable EU regulations and standards Warning hot surfaces Warning safety hazard Read the documentation Waste Electrical and Elec tronic Equipment WEEE Solar inverters must...

Page 11: ...with the device are part of the product and must be kept safe for use at any time Operation Switch on CAUTION This step must be performed by certified electrical companies only Switch on the circuit b...

Page 12: ...the LED status display moves up the energy storage system id charging The top LED of the LED status display indicates the charging level 20 40 60 80 or 100 If the LED status display moves down the en...

Page 13: ...tions are listed in the following document Table 4 Error code Error type Recommendations Red light perma nently on Slight system error Restart the system Red light flashes permanently Severe system er...

Page 14: ...energy storage system in accordance with specifications below the energy storage system min 20 cm or base assembly above the energy storage system min 20 cm in front of the energy storage system min...

Page 15: ...fixings e g screw anchor combinations or anchors with a maximum diameter of 8 mm max drillhole diameter 10 mm must be used For example an installation with four UX 10 x 60 anchors in a concrete wall...

Page 16: ...ark the drillholes Drill at the drawn on markings and push anchors into the drillholes Figure 7 CAUTION When drilling ensure that no dust enters the energy storage system Dirt and dust in the cooling...

Page 17: ...emove the door Once the energy storage system has been installed replace the doors and fix them by pushing down the door split pins Figure 10 Figure 10 Door removal Screw 2 mounting tabs to the top of...

Page 18: ...fix the energy storage system to the wall with anchors and screws Securely fix the sheathed mains cable network cable and photovoltaic string cable below the energy storage system and feed them into t...

Page 19: ...pushing down the door split pins Figure 15 Figure 15 Door removal For a base assembly the optional XEM200 base and a solid floor are required Fix the closed base front plate both base sides and perfo...

Page 20: ...part of the spacer for the wall with the top part of the spacer for the cabinet using the bolt and nut ATTENTION When drilling ensure that no dust enters the energy storge system Dirt and dust in the...

Page 21: ...fastening screws provided Figure 19 Figure 19 Fix the inverter with screws Insert battery controller plugs that are protected against polarity reversal in the inverter Figure 20 Figure 20 Connect the...

Page 22: ...the right then re attach the cable cover so that the cables are all in the cable duct opening Figure 21 Figure 21 Feed out the connection cables from the inverter Connect the pre assembled mains cabl...

Page 23: ...evice disconnect all associated circuit breakers photovoltaic rotary switches and battery module switches Cover all live parts in the area Do not disconnect the DC voltage by disconnecting the DC conn...

Page 24: ...the sequence stated in this instruction Use overvoltage protection modules The overvoltage protection is provided by the DEHNguard overvoltage modules Push the DEHNguard PV500 supplied into the centra...

Page 25: ...10 mm from the meter cabinet to the energy storage system must be installed in the building in accordance with the applicable installation regulations In addition a direct earth conductor 6 mm must t...

Page 26: ...equalisation to the overvoltage protec tor using Pozi Drive screwdriver size 2 Figure 29 Figure 29 Connection of the earth conductor to the overvoltage protection Connecting photovoltaic modules to t...

Page 27: ...aic rotary switch to 0 WARNING Hazard due to electric shock Dangerous touch voltages can occur when assembling photovoltaic systems Keep the positive and negative cables strictly separate from the pot...

Page 28: ...on resistance must be within the limits specified in VDE 0126 23 1 2019 04 Switch off the photovoltaic rotary switch 0 position Connect the connection cables of the photovoltaic modules that have been...

Page 29: ...RJ45 patch module in the main connection area of the energy storage system with the customer s router network through network cables at least Cat 6 recommendation in the Hager catalogue G8311 Figure 3...

Page 30: ...set times and comprises a maximum of 2 hours hard locking Relay 1 Off Relay 2 Off Operating status 2 standard operation In this switching mode the heat pump runs in energy efficient normal opera tion...

Page 31: ...to terminals 1 and 2 of the two SG Ready relays Connect the heat pump controller cable to the contacts of the SG Ready relays see heat pump installation instruction Practical tip Alternatively one bi...

Page 32: ...eaking electrolyte gets into contact with the eyes this can result in eye injuries Rinse eyes thoroughly with water and also contact a doctor Swallowing If electrolyte has been swallowed Induce vomiti...

Page 33: ...st therefore be taken when creating the electrical connection Battery module structure The battery modules are shown below as they are used in the energy storage system The battery module consists of...

Page 34: ...odule so that the connections for the battery power cables 10 and 18 are on the right Place the battery module s in the battery module mounting device of the energy storage system and fix it by screwi...

Page 35: ...off switch on the battery module 23 24 Figure 37 Battery module connection with one battery module 23 RJ45 jack 24 Master battery jack Energy storage system battery module connection with two battery...

Page 36: ...the cable can lead to severe damage There can be a longer period between installing the battery modules and the actual commis sioning of the energy storage system To prevent a deep discharge of the b...

Page 37: ...Ds continue to show the battery charging status In the exam ple here this is 50 or more The warning mode ends auto matically once the battery module gets back to normal state Contact the service team...

Page 38: ...d and firmly wired to the house installation The installation and electric connection to the house installation as well as the clockwise ro tating field have been checked The installation and electric...

Page 39: ...e of charge SOC of the battery Meanwhile the battery is charged up to 100 without accounting for the household con sumption then fully discharged without accounting for the photovoltaic energy generat...

Page 40: ...chnology Cos Phi 0 9 0 9 General data Max efficiency of the entire system 88 Effectiveness of the photovoltaic inverter EU 95 AC short circuit proof earth fault monitoring yes yes Operating temperatur...

Page 41: ...0 Protection class 1 Degree of contamination 2 Recommended external protection and switch off devices not included in scope of delivery Residual current circuit breaker CFB640E 4 pin 10 kA 40 A 300 mA...

Page 42: ...e recycled by the system engineer and Hager Please therefore contact the system engineer who will arrange for Hager to recycle the battery modules Disposal Disposal of electrical and electronic device...

Page 43: ...Page 43 44 05 2021 6LE007528B hager com Subject to technical changes flow Energy storage system...

Page 44: ...Hager Vertriebsgesellschaft mbH Co KG Zum Gunterstal 66440 Blieskastel Germany hager com Hager AG Sedelstrasse 2 6020 Emmenbr cke Switzerland hager ch...

Reviews: