- 4 -
1.
Attention
1.1 Inspection And Acceptance
Please check carefully when open the package and make
sure no parts are missing.
1.2
Safey
Please read the operation manual cafefully before the
installation and adjustment of the machine.when finish the
installation ,check all the details and trial run the
machine idly before put it into operation .
1.3 Caution
Keep in mind the safety measures for electrical and
operating protection.
2.
Work Environment
2.1 The elevation of workshop has to be 2000m or less.
2.2 NO conductive dust allowed.
2.3 NO explosive factor allowed.
2.4 NO corrosive gas or steam which may corrode metal
or damage the insulation.
2.5 Keep away from the source of impact or vibration.
3.Operation Instruction
3.1.1 Before starting themachine,read carefully the operation
Page 5
Instruction Manual for HM-51B (M577)
25/03/2019