11
OPERATION MANUAL
4.1 UNPACKING
This machine was carefully packaged for safe transport. When unpacking, separate all enclosed
items from packaging materials and inspect them for shipping damage. If items are damaged,
please contact your distributor.
NOTE: Save all the packaging materials until you are completely satisfied with the machine and
have resolved any issues with the distributor, or the shipping agent.
When unpacking, check the packing list to make sure that all parts shown are included. If any
parts are missing or broken, please contact the your distributor.
4 SETUP
The unpainted surfaces of the machine have been coated with a waxy oil to protect them from
corrosion during shipment. Remove the protective coating with a solvent cleaner or a citrus
based degreaser.
Optimum performance from your machine will be achieved when you clean all moving parts or
sliding contact surfaces that are coated with rust prevented products.
It is advised to avoid chlorine based solvents, such as acetone or brake parts cleaner, as they
will damage painted surfaces and strip metal should they come in contact. Always follow the
manufacturer’s instructions when using any type of cleaning product.
4.2 CLEAN - UP
4.3 SITE PREPARATION
When selecting the site for the machine, consider the largest size of workpiece that will be
processed through the machine and provide enough space around the machine for operat-
ing the machine safely. Consideration should be given to the installation of auxiliary equip-
ment. Leave enough space around the machine to open or remove doors/covers as required
for the maintenance and service as described in this manual.
It is recommended that the machine is stable on the floor to prevent tipping or shifting. It
also reduces vibration that may occur during operation.
4.4 LIFTING INSTRUCTIONS
This machine is extremely heavy.
Serious personal injury may occur if safe moving methods are not
followed. To be safe, you will need assistance and power equip-
ment when moving the shipping crate and removing the machine
from the crate.
On the day that the machine arrives, make sure that a forklift or lifting device, with sufficient
capacity is available to unload the machine from the vehicle. Ensure access to the chosen site
is clear and that doors and ceilings are sufficiently high and wide enough to receive the
machine.