5.

Put the probe in the standard solution. Make sure that the reference junction is fully in
the standard. Move the probe up or down or lightly shake the probe to remove air
bubbles.

6.

Push 

Read

. The display shows "Stabilizing" and a progress bar as the reading

stabilizes. The display shows the value of the check standard and Check Standard
Passed or Check Standard Failed.

7.

If the display shows 

Check Standard Passed

, the check standard measurement is in

the accepted limits. Select 

Done

 to continue the sample measurement.

8.

If the display shows 

Check Standard Failed

, the measurement is out of the accepted

limits. A calibration is recommended. Make sure that the limits are set correctly at the
MTC301 probe Settings menu. If the acceptance criteria is set to "Cal Expires on
Failure: Yes", the display shows the calibration icon and a question mark until the
probe is calibrated again. To correct the probe calibration and status indicator,
calibrate the probe (refer to 

Calibration

 on page 3).

Advanced operation

Parameter-specific settings can be changed through the Full Access Options menu.
Details about menu navigation, available options and how to change them are given in
the screens, tables and procedures throughout this section.

The settings that can be changed are shown in 

Table 2

.

Table 2  Parameter-specific settings

Setting

Options

Measurement Options

Response time

Upper and lower range limits (defines mV limits per method)

Calibration Options

Standard

Calibration reminder

Offset limit

Standard value (if Custom option is selected)

Check Standards Options

Standard (temperature compensated for ZoBell’s and Light’s solutions)

Check standard reminder

Acceptance criteria

Standard value (at 25 °C if Custom option is selected)

Change measurement options

Methods are groups of default or user-defined settings relevant to specific applications. If
the meter is set to the default method and the Modify Current Settings option is chosen, a
prompt for a new name is shown after the changes are entered. The settings are saved
with this name to distinguish them from the default method settings, which cannot be
changed. A saved method can be used instead of multiple adjustments to the individual
settings. Changes made to a user defined method are automatically saved with the
existing name. Multiple methods can be saved for the same probe on each meter.

1.

Make sure a probe is connected to the meter.

2.

Push   and select MTC301 Settings.

8

Summary of Contents for Intellical MTC30101

Page 1: ...ng temperature range 0 to 80 C 32 to 176 F Storage temperature range 5 to 40 C 41 to 104 F Junction Ceramic Reference potential versus Standard Hydrogen Electrode 207 mV at 25 C Fill solution 3M KCl w...

Page 2: ...ode with deionized water thoroughly to remove the viscous storage filling solution completely Blot dry with a lint free cloth 4 Remove the protective tape from the filling hole before initial use refe...

Page 3: ...he temperature range of 0 to 30 C 32 to 86 F Light s solution should be read at 25 C 77 F Custom ORP Redox calibration solution values and temperature are user defined The calibration is recorded in t...

Page 4: ...er to the HQd meter manual for more information Regular calibration is required for the best measurement accuracy refer to Calibration on page 3 Prepare the probe for use refer to Preparation for use...

Page 5: ...ation record the sample pH and temperature 6 Repeat steps 3 6 for additional measurements 7 When measurements are done store the probe refer to Storage on page 11 Measurement conversion to SHE referen...

Page 6: ...ation state After each addition of titrant the ORP Redox electrode develops a potential proportional to the logarithm of the ratio of the activities of the two oxidation states At the inflection or en...

Page 7: ...normality of the sample Nx in equivalents per liter Nx Vt x Nt Vx where Nt normality of titrant Eq L Vt volume of titrant at end point mL Vx Volume of sample mL Run Check Standard The Run Check Stand...

Page 8: ...available options and how to change them are given in the screens tables and procedures throughout this section The settings that can be changed are shown in Table 2 Table 2 Parameter specific settin...

Page 9: ...ush and select MTC301 Settings 3 Select Modify Current Settings 4 Select Calibration Options and update the settings Option Description Standard Sets the calibration standard ZoBell s 221mV 25 C Light...

Page 10: ...stom check standard are user defined 5 Select Check Standard Reminder and update the settings Option Description Reminder Repeat Sets the time interval for the check standard reminder Off default 1 d...

Page 11: ...uct overview on page 1 2 Remove the cap from the tip of the filling solution bottle 3 Hold the bottle so that the tip is down Put the tip of the bottle in the filling hole 4 Slowly squeeze the bottle...

Page 12: ...r manual Large number of methods stored on the probe Continue to let the probe connect Do not disconnect the probe Damaged probe Make sure there is connectivity with another probe or meter to confirm...

Page 13: ...onse time Platinum electrode not conditioned for reducing type samples 1 Make sure that the platinum disc is clean and smooth 2 Put the platinum disc in Reducing Solution for ORP Electrodes for 3 10 m...

Page 14: ...e probe downward in the solution sample to remove any air bubbles in the reference junction holes Out of limits Check standard value is outside of limits set in the current method Make sure that the s...

Page 15: ...15...

Page 16: ...ch com HACH LANGE GMBH Willst tterstra e 11 D 40549 D sseldorf Germany Tel 49 0 2 11 52 88 320 Fax 49 0 2 11 52 88 210 info hach lange de www hach lange de HACH LANGE S rl 6 route de Compois 1222 V se...

Reviews: