![Hach HIAC 9705 Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/hach/hiac-9705/hiac-9705_operators-manual_3266888015.webp)
9705 - Initialization
15 of 82
KS
S
- Mar
ch 2
00
6 - E
di
tio
n
1
HIAC
Operator Manual
2.4
Electrical Connections
2.4.1
USB Communications
On the back of the 9705, shown in
, connect a computer or data device using the
following connectors:
• USB Client
• USB Host (for services updates only, not data transfer)
2.4.2
Power Cable
Connect the end of the power cord to the male socket on the rear panel of the 9705. Plug the
power cord into an appropriately rated AC line.
Attach the AC power cable supplied with the unit to the AC power socket. Do not turn the power
on until installation is complete.
CAUTION:
The round connection slot left of the AC power is for use by service personnel only. Do not
operate the unit with this cover removed.
2.5
Syringe Installation
The syringe is located on the right side of the 9705 as shown in
.
Fig 2-3 :
9705 Right Side View
Syringe access
Summary of Contents for HIAC 9705
Page 1: ...HIAC 9705 Liquid Particle Counting System Operator Manual...
Page 2: ...9705 KSS March 2006 Edition 1 Operator Manual...
Page 6: ...6 of 82 Table of Contents 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 10: ...10 of 82 Manual Overview 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 22: ...22 of 82 Initialization 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 60: ...60 of 82 Operating the 9705 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 64: ...64 of 82 Maintenance Procedures 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 72: ...72 of 82 Service Procedures 9705 KSS March 2006 Edition 1 Operator Manual HIAC...
Page 78: ......
Page 81: ...9705 User Notes 81 of 82 KSS March 2006 Edition 1 HIAC Operator Manual User Notes...