Hach 5410001 User Manual Download Page 7

2.1.1 Use of hazard information

D A N G E R

 

Indicates a potentially or imminently hazardous situation which, if not avoided, will result in death or
serious injury.

W A R N I N G

 

Indicates a potentially or imminently hazardous situation which, if not avoided, could result in death
or serious injury.

C A U T I O N

 

Indicates a potentially hazardous situation that may result in minor or moderate injury.

N O T I C E

 

Indicates a situation which, if not avoided, may cause damage to the instrument. Information that
requires special emphasis.

2.1.2 Precautionary labels

Read all labels and tags attached to the instrument. Personal injury or damage to the instrument
could occur if not observed. A symbol, if noted on the instrument, will be included with a danger or
caution statement in the manual.

This is the safety alert symbol. Obey all safety messages that follow this symbol to avoid
potential injury. If on the instrument, refer to the instruction manual for operation or safety
information.

Electrical equipment marked with this symbol may not be disposed of in European
domestic or public disposal systems. Return old or end-of-life equipment to the
manufacturer for disposal at no charge to the user.

This symbol indicates the need for protective eye wear.

This symbol identifies a risk of chemical harm and indicates that only individuals qualified
and trained to work with chemicals should handle chemicals or perform maintenance on
chemical delivery systems associated with the equipment.

This symbol indicates that a risk of electrical shock and/or electrocution exists.

This symbol indicates that a risk of fire is present.

This symbol, when noted on the product, identifies the location of a fuse or current
limiting device.

2.1.3 Compliance and certification

C A U T I O N

 

This equipment is not intended for use in residential environments and may not provide adequate
protection to radio reception in such environments.

English

   

5

Summary of Contents for 5410001

Page 1: ...DOC023 53 80422 SP 510 03 2022 Edition 13 User Manual...

Page 2: ......

Page 3: ...Electrical connections for conduit 13 3 3 3 Wiring for power 14 3 3 4 Select the voltage 14 3 3 5 Connect the alarm relays 14 3 4 Install the buffer solution 15 3 5 Install the indicator solution 15...

Page 4: ...8 11 Replace the fuse 21 Section 9 Troubleshooting 21 9 1 Troubleshooting for a hard reading 22 Section 10 Replacement parts and consumables 23 Index 25 Table of Contents 2...

Page 5: ...ter alarm transition One reading below the trip point is necessary to trigger a hard to soft water alarm transition Trip point 0 3 1 2 5 10 20 50 and 100 mg L Refer to Trip point specifications on pag...

Page 6: ...0 60 mg L per C Section 2 General information In no event will the manufacturer be liable for direct indirect special incidental or consequential damages resulting from any defect or omission in this...

Page 7: ...mbol to avoid potential injury If on the instrument refer to the instruction manual for operation or safety information Electrical equipment marked with this symbol may not be disposed of in European...

Page 8: ...e the user will be required to correct the interference at their expense The following techniques can be used to reduce interference problems 1 Disconnect the equipment from its power source to verify...

Page 9: ...Indicator and reagent bottles 4 Air purge optional 10 Sample inlet 5 Access cover 11 Enclosure drain 6 Colorimeter 12 Sample drain 2 3 Product components Make sure that all components have been receiv...

Page 10: ...qualified personnel must conduct the tasks described in this section of the document 3 1 Install the instrument Install this instrument on an indoor wall away from direct sunlight For a complete purge...

Page 11: ...Figure 3 Dimensions for wall installation Figure 4 Door clearance English 9...

Page 12: ...e off of the connector when water pressure is applied Note The sample drain connector will install on inch ID flexible tubes customer supplied 3 2 1 Connect the air purge optional An air purge is nece...

Page 13: ...he pump tubes before installation Make sure to turn the screws in small increments and move from one screw to the other so that the plate is pulled down equally Do not overtighten To install the press...

Page 14: ...oint 8 Low flow valve option 3 Drainage flow 6 Filtered sample bypass ball valve shown open 9 High flow valve option 3 3 Electrical installation D A N G E R Electrocution hazard Always remove power to...

Page 15: ...ain power source W A R N I N G Electrocution hazard Install a 10 A circuit breaker for mains power Identify the circuit breaker with a label as a local disconnect for this equipment The instrument has...

Page 16: ...strument is set to 115 volt operation at the factory To change the line voltage to 230 volt operation slide the voltage switch to the 230 V position Refer to Figure 10 on page 14 Note The fuses are ap...

Page 17: ...nal block Terminal 1 Terminal 2 Terminal 3 J7 COM Normally open NO Normally closed NC 3 4 Install the buffer solution Buffer solutions are formulated at the factory and are ready to install without pr...

Page 18: ...stir bar A stir bar is included in the installation kit Install the stir bar in the colorimeter sample cell for correct operation Refer to Figure 13 Figure 13 Install the stir bar Section 4 User inter...

Page 19: ...to Install the pump valve pressure plate on page 11 1 Open the supply valve to the instrument 2 Let the pressure in the tubes stabilize Note If leaks occur under pressure examine all connections Secu...

Page 20: ...steps 2 4 again 6 Push ZERO CAL The zero cal LED is on continuously 7 When the zero cal LED flashes add two drops of EDTA Solution 10 g L into the colorimeter 8 When the LED stops flashing and is on c...

Page 21: ...otective equipment appropriate to the chemicals that are handled Refer to the current safety data sheets MSDS SDS for safety protocols Refer to the MSDS for instructions to safely clean reagent spills...

Page 22: ...are handled Refer to the current safety data sheets MSDS SDS for safety protocols The colorimeter measuring cell can collect sediment or cause layers to grow on the inside walls Clean the cell with a...

Page 23: ...es if necessary The SOFT LED light is not on and the pump motor does operate Problem with the power supply Replace the main circuit board Contact technical support The SOFT LED light is on but the pum...

Page 24: ...block and cause the color to be diluted Make sure to set the flow rate to 200 mL minute The sample line is pinched off in the pinch block Pull the sample line from the colorimeter Water that is alrea...

Page 25: ...ent reads hard again Section 10 Replacement parts and consumables W A R N I N G Personal injury hazard Use of non approved parts may cause personal injury damage to the instrument or equipment malfunc...

Page 26: ...10 g L 1 oz 102133 Magnesium standard solution dropping bottle 10 g L 1 oz 102233 SP510 Hardness Monitor indicator solution for 25 ppm 500 mL 2502749 SP510 Hardness Monitor indicator solution for 50 p...

Page 27: ...2 Colorimeter 20 D Dimensions 8 F Fuse 21 H Hard calibration 18 Hard reading 22 I Indicator solution 15 K Keypad 16 N Navigation 16 P Pressure plate 11 R Reagent 15 19 Reagent line 22 Relay 14 S Sampl...

Page 28: ......

Page 29: ......

Page 30: ...h com www hach com HACH LANGE GMBH Willst tterstra e 11 D 40549 D sseldorf Germany Tel 49 0 2 11 52 88 320 Fax 49 0 2 11 52 88 210 info de hach com www de hach com HACH LANGE S rl 6 route de Compois 1...

Reviews: