Figure 2 Product components
1
SP-510 Hardness Monitor
5
Indicator solution
2
Installation kit
1
6
Magnesium sulfate solution
3
Maintenance kit
2
7
TitraVer
®
(EDTA) hardness titrant
4
Buffer solution
Section 3 Installation
D A N G E R
Electrocution hazard. Always remove power to the instrument before making electrical
connections.
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks described in this
section of the document.
3.1 Install the instrument
Install this instrument on an indoor wall, away from direct sunlight.
• For a complete purge of the sample line during each cycle, install the instrument as close to the
sample point as possible.
• Leave sufficient clearance at the bottom and sides for tubing and cable connections.
Refer to
1
Refer to the installation kit documentation for more information.
2
Refer to the maintenance kit documentation for more information.
8
English
Summary of Contents for 5410001
Page 1: ...DOC023 53 80422 SP 510 03 2022 Edition 13 User Manual...
Page 2: ......
Page 11: ...Figure 3 Dimensions for wall installation Figure 4 Door clearance English 9...
Page 28: ......
Page 29: ......