Habasit Italiana S.p.A.
Via del Lavoro 50
I-31016
– Cordignano (TV)
Tel.: +39 0438 9113
Fax: +39 0438 912374
Use and maintenance manual
W-01
Author:
FT
Page 14 of 15
Edition:
06/2017
R. 0
Replaces:
11 A1 - Preventive maintenance checklist
Job positions:
A: Machine operator
B: Maintenance technician
Work to be performed
Frequency
Spare part code
(for additional information and reference numbers, see user manual)
Periodic (monthly)
Evaluation criteria
Daily
1
6
Note
1.
Cleaning
1.1
Clean the machine after use removing residue deposits
A
2.
Inspect the power cord
2.1
Inspect the cord and plug to ensure there are no defects
B
Insulation damaged,
Defective connections
3.
Measure heating plate temperature
3.1
Proceed as thoroughly indicated in user manual
chapter “MAINTENANCE”
B
Observations and notes:
Summary of Contents for CQ-02
Page 20: ......