2-8
Figure 2-11 Securing the AP to the horizontal pole
2.
As shown by callout 1 in
, use a T8 Torx screwdriver to loosen the two screws on
the base so that the AP can rotate.
3.
Rotate and adjust the AP until the bubble in the level is in the middle.
4.
Fasten the two screws on the base to fix the rotation shaft of the AP.
Figure 2-12 Adjusting the AP
Pole-mounting the AP by using the optional pole-mounting
kit
IMPORTANT:
To pole-mount the AP by using the optional pole-mounting kit, make sure the pole diameter is in the
range of 65 to 200 mm (2.56 to 7.87 in).
1
2
Level
Bubble