1-1
1
Preparing for installation
WARNING!
Install the AP under the guidance of technical engineers and read this chapter carefully before
installation.
Examining the installation site
Examine the installation site before installation to ensure that the AP will work in a good
environment.
Installation site selection
The installation site must be selected according to the network planning and technical requirements
of telecommunications equipment, with factors such as climate, hydrology, geology, earthquake,
electric power, and transportation taken into consideration.
Determine the installation location by observing the following principles:
•
The AP will not be exposed to moisture, high temperature, dust, harmful gases,
electromagnetic interference sources (high power radars, radio stations, or electrical
substations), unstable voltage, heavy vibration, and loud noise.
•
The location is not water seeping, water soaking, and condensing.
•
The location is away from inflammable and explosive substances.
Temperature and humidity requirements
Table1-1 Temperature and humidity requirements
Item
Specification
Operating temperature
–40°C to +65°C (–40°F to +149°F)
Storage temperature
–40°C to +85°C (–40°F to +185°F)
Operating humidity
0% RH to 100% RH, noncondensing
Storage humidity
0% RH to 100% RH, noncondensing
Protection class
IP68
Power supply
Power the AP by using a power injector. No power injector is provided with the AP. You can
purchase an H3C power injector for the AP. See "
Powering the AP by using a power injector
" for the
connection method.