5
2
Installing the gateway
Installation flow
Figure 2-1 Installation flow
Ground the gateway
Check before and
after power-on
Operating
correctly?
End
No
Power off the
gateway
Troubleshoot the
gateway
Install modules
Rack-mount the
gateway
Connect signal
cables
Install cable
manag ement bra ckets
Install fan trays
Install power
supplies
Read safety
guidelines
Inspect the gateway
Examine the
installation site
Pre pare insta llati on
tools an d a ccessories
AC power supplies
DC power supplies
Interface modules/service
modules and interface
switch modules/AI security
engine modules
SEMs and switching
fabric modules
Start
Prepare for
installation
(Optional) Install air
filter doors
Yes
HVDC power
supplies