PEL-3211(H) User Manual
34
Turning the Load On
Note
When operating in parallel, the load line inductance
could be increased or the stability of the units could be
reduced. If necessary, reduce the response speed
setting and slew rate setting to increase stability. See
the user manual for details.
1.
Turn the slave and master units on.
2.
Set the operation mode and settings on the
master unit.
The master’s settings will be used by the slave
units.
3.
Turn the load on from the Master unit.
All measurements will be displayed updated on
the Master unit only.
4.
The LINK indicator will turn green when the
load is on and the booster units are connected.