EN
39
ASSEMBLY INSTRUCTIONS
Ceiling
-
island mounting
1.
(For exhaust air operation) Prepare
suitable exhaust air ducting in the wall /
ceiling.
2.
Determine the operating side of the
hood on the side where the control pa-
nel is located
3.
To achieve optimum extraction capacity,
determine the position of the cooker
hood centrally above the hob (use a
plumb bob to help) and mark the centre
of the tower on the ceiling.
4.
Mark the position for the fixing holes
using the drilling template or according
to the dimensional drawing on page 10.
5.
Drill four holes (Ø10mm) and insert
dowels.
6.
Screw hanger bolts into the dowels until
they protrude by approx. 20mm, then
screw nuts onto the hanger bolts. For
standard towers with quick mounting
flange, screw nuts onto the hanger
bolts in the same way.
7.
Lead the exhaust air
hose
(exhaust
air
operation)
and
connection line down
from the ceiling. The
exhaust
air
hose
should be about 10
cm longer than the
upper tower.
Summary of Contents for Campo 05/0501 I
Page 11: ...DE 11 PRODUKTBESCHREIBUNG Maßzeichnungen Palma W 600 750 900 1000 1200 1500 Abluft Umluft ...
Page 12: ...DE 12 PRODUKTBESCHREIBUNG Maßzeichnungen Sombra W 900 1200 1400 Abluft Umluft ...
Page 34: ...EN 34 Sombra W 900 1200 1400 PRODUCT DESCRIPTION Dimension drawings exhaust air ambient air ...
Page 122: ...NL 122 PRODUCTBESCHRIJVING Maatschetsen Sombra W 900 1200 1400 Uitlaatlucht Luchtcirculatie ...