EN
35
ASSEMBLY INSTRUCTIONS
Assembly preparation
On
-
site preparations
For the installation of the hood, the customer must ensure that the hood can be installed
smoothly, cover kitchen appliances
-
remove obstacles.
Prepare suitable exhaust air ducting in the ceiling, open false ceiling, create openings, etc.
Before drilling in the wall, ensure that no pipes behind it can be damaged.
If not yet available, lay the power supply line.
For exhaust air operation (A+B), install a window contact switch !
Summary of Contents for Campo 05/0501 I
Page 11: ...DE 11 PRODUKTBESCHREIBUNG Maßzeichnungen Palma W 600 750 900 1000 1200 1500 Abluft Umluft ...
Page 12: ...DE 12 PRODUKTBESCHREIBUNG Maßzeichnungen Sombra W 900 1200 1400 Abluft Umluft ...
Page 34: ...EN 34 Sombra W 900 1200 1400 PRODUCT DESCRIPTION Dimension drawings exhaust air ambient air ...
Page 122: ...NL 122 PRODUCTBESCHRIJVING Maatschetsen Sombra W 900 1200 1400 Uitlaatlucht Luchtcirculatie ...