
26
6.2.7.6
PIPELINE PARAMETERS
BS-02
48)
Operation pipeline ..........................................................
Selection
No / ZUP / LAP / ERW
*
Release of pipeline...................................................
Selection
40°C / 65°C – 80°C
49)
*
Po-charge ON ..........................................................
Selection
0°C – 20°C
50)
*
Po-charge OFF (full) ................................................
Selection
0°C – 20°C
51)
*
Po-charge OFF (part) ...............................................
Selection
0°C – 20°C
50)
*
Pu-charge OFF ........................................................
Selection
0°C – -20°C
52)
** Source .....................................................................
Selection
buffer 0 / buffer 1 / buffer 2 / buffer HP0
53)
Delta T Fern ...................................................................
Selection
0°C – 50°C
*
Source-buffer difference below .................................
Selection
0°C – 50°C
back to the SERVICE LEVEL ..................
look at chapter 6.2.7
INFO
*
The menu buttons are visible when the long-distance line function LAP is programmed.
**
The menu button is visible when the long-distance line function ZUP and LAP is programmed.
48)
ZUP / PUP / LAP
..... Activate the correct long-distance line function according to the installed system scheme.
ERW
........................ Aktivierung einer Heizkreiserweiterung mit zusätzlichem Wandgerät Set-MK 261.
49)
During heating operation, the temperature at the top of the pipeline buffer must be 6°C below the highest required temperature of a
heating or hot water circuit (factory setting) so that the buffer can be loaded again.
Example:
highest requirement temperature = 50°C
Start charging when the temperature falls below 44°C at the top buffer sensor.
50)
The switch-off condition for the FULL loading program is met at the long-distance line buffer when using the factory setting at 55°C at
the top buffer sensor and 45°C at the bottom buffer sensor.
55°C Buffer TOP temperature
=
Buffer target temperature 55°C
plus
Po-charge OFF (full)
0°C
45°C Buffer LOW temperature
=
Buffer target temperature 55°C
plus
Pu-charge OFF
-10°C
51)
The switch-off condition for the PART charging program is met when using the factory setting at 61°C at the top of the buffer.
61°C Buffer TOP temperature
=
Buffer target temperature 55°C
plus
Po-charge OFF (part)
6°C
52)
Specification of the source from which the energy for the buffer storage is obtained.
53)
With (long-distance) lines, for example, a temperature loss caused by the length of the line can be compensated. A setting of, for
example, 2°C loss. increases the setpoint temperature by the set value.
6.2.7.7
RETURN MIXER PARAMETERS
PH-02
54)
Operation return mixer ...................................................
Selection
AUTO
Return mixer running time ..............................................
Selection
10 – 300 secunds
Return temperature target ..............................................
Selection
40°C – 90°C
55)
Return mixer Delta T ......................................................
Selection
5°C – 30°C
56)
Return mixer delta T min ................................................
Selection
5°C – 30°C
57)
Start relief .......................................................................
Selection
Yes
back to the SERVICE LEVEL ..................
look at chapter 6.2.7
INFO
54)
Auto
......................... Variable control of the return temperature with active start-up relief and/or partial load limit.
Fixed
....................... Fixed regulation based on the target return temperature set under the RLT target parameter.
open
........................ Function for test or emergency operation --- Manually open the RLM bypass line.
close
........................ Function for test or emergency operation --- Manually close the RLM bypass line.
OFF
.......................... Function for test or emergency operation --- Turn off the RLM mixer manually.
55)
Specifies the difference (spread) between the boiler setpoint temperature and the boiler return temperature.
56)
Determines the minimum difference (spread) between the boiler target temperature and the boiler return temperature after reaching
100% buffer load for partial load control.
Attention: Partial load control only possible with active additional sensors (5-sensor buffer management).
57)
When the start-up relief is activated, after the boiler has started, the target return temperature increases by the set value at most, in
order to enable the target boiler temperature to be reached more quickly.