
3
CONTENTS
BS-01
Page
1 Introduction ............................................................................4
1.1
Safety instructions
4
1.2
Gurantee and liability
4
1.3
Taking in Service
4
1.4
Site requirements
4
2 PLANING .................................................................................5
2.1
Fire safety
5
2.2
Minimum fire safety requirements
6
2.3
Boiler room requirements
7
2.4
Flue requirements
9
2.5
Flue draught and pressure- surge compensator
10
2.6
Fuel storage
11
2.7
Examples for Planing
13
2.8
Heatingcirculation rule
15
3 CONSTRUCTION ..................................................................16
3.1
Delivery
16
3.2
Carrying to installaion site
16
3.3
Positioning and aligning the boiler
16
3.4
Hydraulic Integration
17
3.5
Filling and bleeding the system
19
3.6
Flue connection
20
3.7
Construction holding
21
3.7.1
System FLEX
21
3.7.2
System BOX
25
3.7.3
System Weekbox
26
4 ELECTRICAL CONNECTIONS .............................................28
4.1
Heating system electrical connections
30
5 FINAL CHECKS.....................................................................31
6 STANDARDS / REGULATIONS............................................32
7 Electrical wiring diagramme................................................33
8 TECHNICHAL DATA .............................................................37
8.1
Biostar 12 / 15 / 23 FLEX / BOX
37
8.2
Biostar 12 / 15 / 23 W
38
8.3
Feed SYSTEM FLEX
39