3.7.3 SYSTEM WEEKBOX
WEEKBOX
BS-01
The installation and the vicinity of the furnace may only consist
of fire-resistant materials.
Location
1. Set up the boiler by means of adjustable feet (1) rising
slightly towards the rear.
2. Turn in the screwfeet (2) exactly.
3.
The screw feet (3) at week container to the same degree as the
set screw feet (1) on the boiler.
4.
Week the containers on the drop shaft flange (4) so donned
that the centering bolt lock (5) and the bonded seal is not
damaged.
5.
Remove the container screw (2) again so far that these can
easily be supported on the ground.
The Container has to lay 100% tight on the flange!
6. After that sure thread bolt (6) with an bolt and sure it with
nut screw M08.
7. Connect fillers sensor and doorcontactswitch with
circuitboard like circuit diagramme.
Functions checking at Beginning service:
Open the box lid, turn on the net switch to „ON“
→
turn on the
ID fan check with a lighter if the air will be suct on in the drop
shaft (5).