8
STORAGE
The Gullco welding positioner should be kept in a dry environment with no possibility of impact or
damage due to stacking of heavy objects on top of the equipment.
SHIPPING
When shipping the Gullco welding positioner, the rotary table should be locked in the horizontal
plane and the mounting table removed and safely packaged. There should be sufficient room
around the perimeter of the shipping box to allow packing to be placed to help protect susceptible
parts from being damaged in shipping. If possible, the whole positioner should be bolted to a flat
piece of wood.
ACCESSORIES
GP-200-024
Run/Stop footswitch assembly for manual operation. This kit provides a run/stop
footswitch; a footswitch guard cover; a connecting control cable; and strain relief
glands. When activated, the footswitch will provide a run signal to the control.
GP-200-025
Variable Speed footswitch assembly for manual operation. This kit provides a
run/stop/variable speed footswitch; a footswitch guard cover; a connecting control
cable; and strain relief glands. When activated, the footswitch will provide a run
signal to the control and allow regulation of the rotational speed via the
compression of the footswitch pedal.
GP-200-023
Forward/Stop/Reverse footswitch assembly for manual operation. This kit
provides directional footswitches; a footswitch guard cover; a connecting control
cable; and strain relief glands. When activated, the footswitch will provide a run
signal and a rotary direction signal to the control.
GP-200
GPP-200
GP-200-016 (GP-200 & GP-200)
Summary of Contents for , GPP-200
Page 2: ......
Page 6: ...4 GENERAL DIMENSIONS...
Page 13: ...11 WELDING POSITIONER PARTS BREAKDOWN DRAWING GP 200...
Page 15: ...13 WELDING GAS PURGE POSITIONER PARTS BREAKDOWN DRAWING GPP 200...
Page 23: ......
Page 24: ...www GULLCO com...
Page 26: ......
Page 35: ...T 9 GSP 1100 CONTROL ASSEMBLY BREAKDOWN SEE NOTES...
Page 36: ...T 10 GSP 1100 CONTROL CIRCUIT BOARD SCHEMATIC DRAWING G1100 RB REV B...
Page 38: ...www GULLCO com...