11
used for cleaning/disinfection and sterilization, and that the validated
parameters are adhered to during every cycle. Please also observe the
applicable legal requirements in your country as well as the hygiene
regulations of the hospital or clinic, especially with regard to the
additional requirements for the inactivation of prions.
8.1.2 Post-operative treatment
The post-operative treatment must be carried out immediately, no later
than 30 minutes after the completion of the operation. The steps are as
follows:
1. Turn off the Heating Handpiece and allow it to stand on the base for
1 minutes to cool down to room temperature at the Work Tip;
2. Use a cotton swab or a clean soft cloth to remove the remaining
Gutta-percha material from the Work Tip,
3. Dry the product with a clean, soft cloth and place it in a clean tray.
Notes:
The water used here must be pure water, distilled water or deionized
water.
8.2 Preparation before cleaning
Steps
Tools: tray, clean and dry soft cloth.
1. Remove the Work Tip Protector from the handle and put it into a
clean tray.
2. Remove the Work Tip from the handle and place it in a clean tray.
3. Wipe the Work Tip and Work Tip Protector with a soft cloth until no
dirt can be seen on the surface. Then dry all accessories with a clean soft
cloth and put them into a clean tray. Cleaning agent can be pure water,
distilled water or deionized water
8.3 Cleaning
The cleaning should be performed no later than 24 hours after the
operation.
The cleaning can be divided into automated cleaning and manual
cleaning. Automated cleaning is preferred if conditions permit.
8.3.1 Automated cleaning
•The cleaner is proved to be valid by CE certificationin accordance
with EN ISO 15883.
▪The cleaning procedure is suitable for the product, and the irrigating
period is sufficient.
It is recommended to use a washer-disinfector in accordance with
Summary of Contents for 28-780
Page 1: ......
Page 25: ...ZMN WI 09 459 V1 1 20200102 ...