Doc No 93-0491-4
UNCONTROLLED COPY ONCE PRINTED
PAGE 4 OF 21
2.
Voltage Measurements
Connect a calibrated DVM across the GND and +24V test points on the Interconnect board. Record the
reading in section 4.1 of the build record.
The AUP voltage measurements are in the parameter settings
– hardware in the ASI software.
Record the values in section 4.1 of the build record.