GB
Assembly and Initial Putting in Operation
Assembly Group 1
Parts of Delivery
Fig. 2
Fig. 1 – Pos. 2
Fig. 1 – Pos. 5
Fig. 1 – Pos. 6
Fig. 1 – Pos. 7
Assembly Group 2
Parts of Delivery
Fig. 3
Fig. 1 – Pos. 2
Fig. 1 – Pos. 3 / 2x
Fig. 1 – Pos. 4
Fig. 1 – Pos. 12
Assembly Group 4
Assembly Groups Required Parts of Delivery
Fig. 5
Assembly Group 3
Fig. 1 – Pos. 9
Fig. 1 – Pos. 10
Fig. 1 – Pos. 12
Safety Instructions for First Putting in Operation
•
Check the power supply for sufficient protection (16 A, inertial)
•
Wear required clothing (see Fig. 6)
•
Make sure that no other persons are present on the working site or the area of hazard.
•
Take care for no inflammable material being on the site.
16