8)   To connect the load with the UPS, please turn off all the loads 

first, then perform the connection and finally turn on the loads 
one by one. 

9)   No matter the UPS is connected to the utility power or not, the 

output of the UPS may have electricity. The parts inside the unit 
may  still  have  hazardous voltage after turning  off  the  UPS.  To 
make  the  UPS  have  no  output,  power  off  the  UPS,  and  then 
disconnect the utility power supply. 

10)  Suggest  charging  the  batteries  for  8  hours  before  use.  After 

connection,  turn  the  M1/M2/N  input  breaker  (for  tower  3/1 
10k-20K), turn the input switch (for tower 3/1 10K-31C model) in 
the "ON" position, the UPS will charge the batteries automatically. 
You  can  also  use  the  UPS  immediately  without  charging  the 
batteries  first,  but  the  backup  time  may  be  less  than  the 
standard value. 

11)  If  it  is  necessary  to  connect  the  inductance  load  such  as  a 

monitor or a laser printer to the UPS, the start-up power should 
be used for calculating the capacity of the UPS, as its start-up 
power consumption is too big when it is started. 

 

 

 

 

 

 

Tower 3/1 10k-20K

 

19 

 

 

 

 

 

Tower 3/1 10K-31C model 

Fig. 4-6 Input and output Terminal Block wiring diagram 

Important notes:

 If the UPS is used in single mode, JP1 and JP2 must 

be connected. If the UPS is used in parallel mode, the Jumper between 
JP1 and JP2 must be removed. 

 

Use cable cross section and protective device specification   

Model   

Tower 10k 

Tower 20k 

Input L1,L2,L3 
Min.conductor cross section[mm

2

Max.conductor cross section[mm

2

 

2.5 

 

10 

Input L1,L2,L3 breaker (A) 

40A,250VAC 

60A,250VAC

 

Input N, M2 
Min.conductor cross section[mm

2

Max.conductor cross section[mm

2

 

10 
13 

 

21 
25 

Input M2 breaker (A) 

63A,250VAC 

100A,250VAC 

Input fuse (A) 

30A,250VAC 

50A,690AC 

Output L,N, 
Min.conductor cross section[mm

2

Max.conductor cross section[mm

2

 

10 
13 

 

21 
25 

Summary of Contents for ZP120N

Page 1: ...3 Introduction 7 3 1 System and Model Description 7 3 2 Product Specification and Performance 10 4 Installation 13 4 1 Unpacking and Inspection 13 4 2 Input and Output Power Cords and Protective Eart...

Page 2: ...stallation Condensation may occur if the UPS is moved directly from a cold to a warm environment The UPS must be absolutely dry before being installed Please allow an acclimatization time of at least...

Page 3: ...o liquid or other foreign objects can enter the UPS 3 1 3 Maintenance servicing and faults The UPS operates with hazardous voltages Repairs should be carried out only by qualified maintenance personne...

Page 4: ...n the original packaging to protect against shock and impact 1 5 Storage The UPS must be stockpiled in the room where it is ventilated and dry 5 1 6 Standards Safety IEC EN 62040 1 EMI Conducted Emiss...

Page 5: ...the basis of this DC voltage the inverter generates a pure sinusoidal AC voltage which is constantly powering the loads Computers and Peripherals are thus powered entirely by the UPS In the event of p...

Page 6: ...t l Optional connectivity cards with enhanced communication capabilities l Remote shutdown control through the Remote Power off RPO port l For tower 3 1 10k 20k Maintenances are simplified by allowing...

Page 7: ...45A 48 1A 45 5A 4 3 5A 41 7A 90A 96 2A 90 9A 8 7 0A 83 3A 45A 48 1A 45 5A 4 3 5A 41 7A Dimension WxDxH mm 350x650x890 260 550 708 Net Weight kg 127 188 85 2 Electrical Performance Input Model Voltage...

Page 8: ...regulations 4 1 Unpacking and Inspection 1 Moving to the installation site The tower 3 phase series UPS has wheels making it easy to move the UPS to the installation site after it has been unpacked H...

Page 9: ...4 2 Unpacking step2 15 The shipping materials are recyclable After unpacking save them for later use or dispose of them appropriately 2 Inspect the appearance of the UPS to see if there is any damage...

Page 10: ...cated on the rear panel of the UPS please refer to the appearance diagram 2 For tower 3 1 10K 10K 31C UPS it is recommended to select the UL1015 8AWG 10mm2 wire or other insulated wire which complies...

Page 11: ...andard value 11 If it is necessary to connect the inductance load such as a monitor or a laser printer to the UPS the start up power should be used for calculating the capacity of the UPS as its start...

Page 12: ...section mm2 10 13 External Battery Cabinet Positive Pole Neutral pole Negative pole Min conductor cross section mm2 Max conductor cross section mm2 10 13 Protective Earthing conductor mm2 MAX 13 Torqu...

Page 13: ...connectors if you had did step one 3 Do not attempt to connect any loads to the UPS now You should connect the input power wire to the right position first And then set the breaker of the battery pac...

Page 14: ...ms 1s to select the present menu option or enter next menu but do not change any setting Select one menu option Press this button for 100ms 1s to select the present menu option or enter next menu but...

Page 15: ...tus l Running information including parallel UPS and running time Fig 5 2 The default LCD display The more detailed operation of LCD is illustrated in the chapter of 5 4 27 5 2 Operating Mode The diff...

Page 16: ...single phase input and there is no derating with three phases input Fig 5 9 Warning When the warning occurs it illustrates that there are some abnormal problems during the operation of UPS Normally th...

Page 17: ...S will transfer to Line mode without output interruption of the UPS 5 3 3 Turning Off UPS With Utility 1 To turn off the inverter of UPS by pressing button continuously for more than 3 seconds and the...

Page 18: ...e see Fig5 14 5 4 3 The Event Log Menu By pressing on the menu of Event log the display would enter the next event menu tree All the old event alarm and fault have been recorded here The information i...

Page 19: ...ter the next control menu tree 1 Start Battery Test is one command to control the UPS to do the battery test 2 Clear EPO status once EPO status is enabled the UPS output would be cut off To recover to...

Page 20: ...ntification information includes UPS serial number firmware serial number model type would be shown here By press 1s the display would return the last main menu tree Fig 5 18 Identification menu tree...

Page 21: ...age the load battery or UPS The most of settings could only be done while UPS is in Bypass mode Fig 5 19 Setting menu tree Password is USER when enabled 39 Example set rated output voltage value Fig 5...

Page 22: ...supplied continuously 41 The great virtue is the output frequency is fixed which is required by some very sensitive loads But the load should be derated to 60 when running in converter mode with singl...

Page 23: ...e loads 7 Each UPS need an independent battery pack 8 Please refer to the wiring diagram in the following diagram 9 The distance between the UPSs in parallel and the breaker panel is required to be le...

Page 24: ...the maintenance switch in the ON position and turn the output switch in the OFF position 45 4 For tower 3 1 10k 20k Set the main maintenance switch or static switch from UPS to BPS For tower 3 1 10K...

Page 25: ...ain output breaker switch For tower 3 1 10k 20k set the main maintenance switch or static switch from BPS to UPS then set the UPS own maintenance switch from BPS to UPS and screw the maintenance cover...

Page 26: ...age tripping device must be provided as shown in Fig 6 3 The isolation device must be able to carry the UPS input current see resp table of basic UPS operating instructions The isolation device has to...

Page 27: ...the EPO connector status On Maintain Bypass Alarm code 72 Maintain bypass switch is open Check the maintain bypass switch status Battery Disconnect Alarm code 11 Battery pack is not connected correct...

Page 28: ...capacity Ex one 10KVA and one 20KVA are forbidden to parallel ECO In Para Alarm code EB HE function is enabled in parallel system HE function is forbidden in parallel system 53 7 2 Trouble Shooting A...

Page 29: ...le Check if the input breaker is closed BYPASS LED light up even though the power supply is available Inverter not switched on Press On Switch I to turn on UPS BATTERY LED lights up and audible alarm...

Page 30: ...y in the course of discharging the standard charging time for the standard UPS should be at least 12 hours 57 8 2 Replacement and Disposal of Batteries 1 Before disposing of batteries remove conductiv...

Page 31: ...te 59 3 Remove the battery pack from the cabinet See Fig 8 3 Fig 8 3 Easy for Battery Replacement Step 3 4 Replace the old battery packs with the new ones 5 Reconnect the DC cables Note The battery pa...

Page 32: ...the UPS through internet intranet Please contact your local distributor for further information 9 3 AS400 Interface Option Except for the communication protocol as mentioned above this series UPS has...

Page 33: ...d with local computer through RS232 or USB protocol no matter how far from the UPSs Installation procedure 1 Go to the website http www ups software download com 2 Choose the operation system you need...