![GSWeb Playground Equipment ROLLING HILLS GS-RH104 Installation & Maintenance Instructions Manual Download Page 6](http://html1.mh-extra.com/html/gsweb-playground-equipment/rolling-hills-gs-rh104/rolling-hills-gs-rh104_installation-and-maintenance-instructions-manual_2275798006.webp)
GSWeb Playground Equipment
E-mail) [email protected]
Website) www.gsweb21.com
Tel) +82 (0)55 326 9025
Fax) +82 (0)55 326 9026
65, Saengnim-daero 259beon-gil, Saengnim-Myeon
Gimhae-si, Gyeongsangnam-do, Republic of Korea
ROLLING HILLS
MODEL NO.
Rev_2
2016.05
GS-RH104
6
OVERALL ASSEMBLY
Overall Assembly
Assemble the pipes in alphabetical order.
1. Check the pipes‟ numbers on Stickers on them.
2. As below picture, Line up the pipes and Connect the pipe to the next pipe
3. Set the holes on the pipe and put bolts into the holes.
4. Fasten the bolts.
5. Repeat with the others in the same way.
Bolt
M12 x L35
“B”
“A”
“B”
“A”