![GSWeb Playground Equipment ROLLING HILLS GS-RH104 Installation & Maintenance Instructions Manual Download Page 3](http://html1.mh-extra.com/html/gsweb-playground-equipment/rolling-hills-gs-rh104/rolling-hills-gs-rh104_installation-and-maintenance-instructions-manual_2275798003.webp)
GSWeb Playground Equipment
E-mail) [email protected]
Website) www.gsweb21.com
Tel) +82 (0)55 326 9025
Fax) +82 (0)55 326 9026
65, Saengnim-daero 259beon-gil, Saengnim-Myeon
Gimhae-si, Gyeongsangnam-do, Republic of Korea
ROLLING HILLS
MODEL NO.
Rev_2
2016.05
GS-RH104
3
Foundation Information
!Attention
Please refer to following details for foundation work.
Base plates are welded to the Rolling Hill‟s pipe. After assembling
pipes and nets, fix the structure on the concrete.
700
700
3,70
0
700
700
700
700
700
700
700 1,430
3,700
700
4,830
700
2,415
700
700
550
700
550
700
500
500
2,005
1,34
5
1,34
5
1,80
0
250
250
250
1,80
0
250
700
1,80
0
550
700
550
F1
F3
F2
F4
F4
F4
F4
F4
F4
F4
3,140
6,89
0
1,640
1,68
5
2,30
0
1,90
5