GSWeb Playground Equipment
E-mail) [email protected]
Website) www.gsweb21.com
Tel) +82 (0)55 326 9025
Fax) +82 (0)55 326 9026
65, Saengnim-daero 259beon-gil, Saengnim-Myeon
Gimhae-si, Gyeongsangnam-do, Republic of Korea
ROLLING HILLS
MODEL NO.
Rev_2
2016.05
GS-RH104
4
Post Plate Assembly
Foundation Detail F1, F2, F3, F4
Pouring Concrete
Pour concrete* into wooden support frame until flush to top edge
Allow 3-5 days for concrete to cure before proceeding to next step.
*Concrete is to be wet concrete with
minimum 25 MPA / 3500PSI.
3,700
3,700
300
3,844
300
1,640
3,700
300
700
700
700
700
F1
1,640
2,300
500
500
6,890
3,844
<FOUNDATION 1>
<FOUNDATION 2>
<FOUNDATION 3>
<FOUNDATION 4>