(1) The address number of the interface should be programmed by hand held
programmer by project’s request before it is used to the system. The interface
is defaulted two loop, so it has two address numbers-- ×× and ××
+
1. If the
address number is required to change, modify the address number of Loop I
,
and that of Loop II will be added to 1 automatically.
(2) When there only needs one heat cable, change the device type of the interface
from 8 to 18. See
Hand Held Programmer Installation and Operation Manual
for details.
(3) After wiring and installation, power on the fire alarm control panel and enter
system commission state. First check whether all the interfaces registered and
write unregistered interface down to find faults. As for the registered interfaces,
they are defined as linear heat cable with device type 8 through fire alarm
control panel. See Fire Alarm Control Panel Installation and Operation Manual
for the specific definitions.
(4) All the interfaces, other detectors, modules are registered, power on the
system and make it in normal condition. At the time, the interface should not
report fault or alarm.
(5) The detector is made up of the interface, the terminal and heat cable. Fig. 14
shows its system composition.
VII Testing
Instructions: After installation and commission, register the devices through the fire
alarm control panel then check whether all the interfaces registered and write
unregistered interface down to find faults. As for the registered interfaces, make
simulation and manual fire test. When short condition occurs to the heat cable, the
address number of related interface will transmit such a status to the fire alarm control
panel which generates fire alarms.
1. Before testing, notify the proper authorities that the system is going to be
maintenance and out of service temporarily. Disable the zone or system
undergoing maintenance to avoid unwanted alarms.
2. Manual Fire Test: Remove the commission tool, put its
Commission Zone
close to
Fire Test position on the upper part of the terminal. Check whether the red LED is lit.
Remove the commission tool to clear fire condition, the system goes back in normal
monitoring state. Fig. 15 shows the fire test.
Fire
Test
Fig. 15 Fire Test
3. Simulation Fire Test: Put a part of curved cable into boiling water over 0.3m from
the terminal. The cable length in the water is 1m, and fire alarm should be given in