C-9102 (UL)

 

Conventional Photoelectric Smoke Detector

 

              

                             

 

                

Installation and Operation Manual

 

  

                                                  

      

    

 

 

Page 4  

Output-

DZ-03 Base

DZ-03 Base

4.7k
Terminal 
Resistor

CAUTION: 

DO NOT USE LOOPED WIRE UNDER TERMINAL 3. BREAK WIRE 

RUN TO PROVIDE SUPERVISION OF CONNECTIONS.

Compatible 
   FACP

Fig. 5 Wiring 

4.  Mounting 

There are location elements on the detector and the orientation base to ensure there is 

only one installing position.  There are two marks on point A and B of the orientation 

base, and a mark on point C of the side face of bottom of the detector.  When installing, 

aligning the mark C of the detector to point A of the orientation base, rotate the detector 

clockwise to point B, then the detector is installed.

 

The  detector base is designed with anti-tamper function.  After installing the detector 

onto the base, twist a ST2.9X6.5 cross recessed pan head tapping screw into the hole 

on the side of the base to prevent removal of the detector.  Then the detector can only 

be removed after twisting off the screw by a screwdriver.  (Note: Please use this function 

only when necessary to avoid trouble in maintenance and repair.)

  

5.  Location and Spacing 

1)  The horizontal distance from the detector to the wall or the girder should not be 

less than 0.5m. 

2)  There should not be any obstruction within 0.5m around the detector. 

3)  The  horizontal  distance  from  the  detector  to  the  blast  hole  of  any 

air-conditioner should not be less than 1.5m; that to the multi-hole ceiling blast 

should not be less than 0.5m. 

4)  When installing detectors on corridor ceilings not wider than 3m, they should 

be  placed  in  the  middle.  The  spacing  should  not  be  more  than  15m.    The 

distance  from  the  detector  to  end  wall  should  not  be  more  than  half  of  the 

spacing. 

5)  The detector should be installed horizontally.  If it has to be installed aslant, the 

gradient angle should not be more than 45

o

6.  Wiring: 227 IEC 06 cable with cross section not less than 1.0mm

2

VI  Testing 

Warning: Power up only after all devices are well connected. 

1.  Before  testing,  notify  the  proper  authorities  that  the  system  is  undergoing 

maintenance  and will temporarily be out of service.  Disable the zone or system 

undergoing maintenance to avoid unwanted alarms. 

2.  Test the detector after installation and regular maintenance. 

3.  Test Method 

Summary of Contents for C-9102

Page 1: ...C 9102 UL Conventional Photoelectric Smoke Detector Installation and Operation Manual Issue 1 04 July 2012...

Page 2: ...Installation and Operation Manual CONTENTS I General 1 II Features 1 III Technical Specifications 1 IV Structure and Operation Principle 2 V Mounting and Wiring 2 VI Testing 4 VII Troubleshooting 5 VI...

Page 3: ...ons 1 Operating Voltage 12VDC 28VDC 2 Operating Current Standby Current 60 A Alarm Current 10mA I 30mA Note The alarm current depends on the current limit of the FACP It s not allowed to power the det...

Page 4: ...rticles In smokeless condition it only receives very weak infrared light When smoke particles enter the received light signal increases by scattering When smoke reaches certain density it can output a...

Page 5: ...There are four terminals with numbers on the base 1 connects with the anode of the output end of compatible FACP 2 connects with terminal No 1 of the next base as output 3 connects with terminal No 3...

Page 6: ...this function only when necessary to avoid trouble in maintenance and repair 5 Location and Spacing 1 The horizontal distance from the detector to the wall or the girder should not be less than 0 5m...

Page 7: ...s sensitivity Fig 6 Testing 4 After testing reset the detector by power cut over 5s Notify the proper authorities the system is back in operation 5 If a detector fails in testing clean it as described...

Page 8: ...totally cleaned you can take down the sensing chamber and pull out the insect net along axle clean or replace the insect net then remove the dust on the sensing chamber by vacuum pump or cleaner and...

Page 9: ...ions and relative national code 9 The detector should be tested regularly at least once a year X Quality Warranty This detector is approved by UL as a recognized component It s strongly recommended th...

Page 10: ...Gulf Security Technology Co Ltd No 80 Changjiang East Road QETDZ Qinhuangdao Hebei P R China 066004 Tel 86 0 335 8502434 Fax 86 0 335 8502532 service gst fs utc com www gst com cn 30302468...