Autoflow Operation
30
Set Control Switches
♦
MOISTURE CONTROL Switch
On
♦
AERATION FAN Switch
Off
♦
LOAD AUGER Switch
Off
♦
FAN Switch
Off
♦
HEATER Switch
Off
♦
DUMP Switch
Auto
♦
DRY and HOLD Switch
Off
♦
Autoflow Emergency Stop Switch
Out
♦
Actuator Emergency Stop Switch
Out
♦
Fill System Control Box Emergency Stop Switch Out
♦
24 VOLT POWER Switch
On
Control Power Switch
Turn the control power switch on. The
switch will light up. The screen will display a
copyright message and software version number,
total running time in hours and minutes and the
model number, and the serial number and current
time and date. At this time, the controller will lock
out all other dryer functions. Once the date and
time are displayed, press the reset button and the
dryer will perform its safety circuit check. If a
fault is found, an error message will be displayed
on the screen. If all are found safe, the main
drying screen will be displayed.
Drying Chamber
Enter the drying chamber and inspect each
dump hopper for obstructions that may inhibit the
flow of grain into the dump chutes. Make sure that
the gap between the discharge flow plates and the
floor sheets is a minimum of 1-1/2. All discharge
flow plates should be adjusted evenly around the
bin. Inspect each discharge flow plate and make
sure that the bottom brackets on each flow plate
have not collapsed, due to pressure from walking
around the drying chamber. Inspect the leveling
bands. Make sure that all leveling bands are
installed properly and are in good shape.
Rotary Switches
View the drying chamber switches from
the peak hole on top of the dryer. Make sure that
all three rotary switches are spinning freely.
Double check the seal on each rotary switch top.
The number one cause of switch failure is water.
Make sure when the electricain replaced the top on
the rotary switch that no creases formed in the
gasket. Inspect both the storage and wet supply
rotary switches for operation and proper seal.
Dump Chutes
Enter the storage chamber. Make sure that
all dump chutes are adjusted evenly. When one
chute is level, make sure that all chutes are level.
This is very critical to the correct operation of the
dryer. The center plate, that all the dump chute
chains attach to, should be no greater than 12
from the pulley when the chutes are level. If the
center plate is further than 12 from the pulley
when the chutes are closed, the chains must be
lengthened.
Linear Actuator
Turn the dump switch on the Autoflow
control box to the manual open position. Use a
FILL SYSTEM CONTROL BOX
Summary of Contents for PNEG-728
Page 1: ...1 Autoflow Operation 1 Autoflow Operation PNEG 728 ...
Page 2: ...Autoflow Operation 2 This page was left blank intentionally ...
Page 6: ...Autoflow Operation 6 DECAL PLACEMENT ...
Page 10: ...Autoflow Operation 10 CONTROL SYSTEM Electronic Monitoring Control System ...
Page 13: ...13 Autoflow Operation CONTROL PANEL ...
Page 14: ...Autoflow Operation 14 CONTROL SYSTEM Electronic Monitoring Control System ...
Page 19: ...19 Autoflow Operation CONTROL SYSTEM ...
Page 20: ...Autoflow Operation 20 CONTROL SYSTEM ...
Page 21: ...21 Autoflow Operation CONTROL SYSTEM ...
Page 22: ...Autoflow Operation 22 CONTROL SYSTEM ...
Page 28: ...Autoflow Operation 28 FILL SYSTEM CONTROL BOX ...